The project consists of the installation of a new pump station to replace the existing Industrial Park Pump Station. The work includes a new pre-cast concrete wetwell, duplex suction lift pumps / controls, a new control building, a diesel bypass pump, a dual auger screen, approximately 254 LF of 12-inch gravity sewer, approximately 133 LF of 12-inch forcemain, electrical work, site grading, demolition of the existing pump station, and associated work tasks.
Delivery Method: Design-Bid-Build
Construction Cost Range: $1,750,000
Documents: www.questcdn.com
The project consists of clearing and grubbing of the new pump station site; associated site work and grading; installation of a new 900 GPM duplex self-priming centrifugal pump station and associated valves and piping; installation of a new standby diesel bypass pump system; approximately 254 LF of new 12-inch gravity sewer; approximately 133 LF of new 12-inch forcemain with associated valves and fittings; demolition of the existing pump station; pump control building, new electrical service, and associated electrical work; HVAC system and SCADA / Instrumentation; installation of a new dual auger screen and compactor; installation, maintenance, and removal of sediment and erosion control facilities; and all related items required for a complete installation.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: City of Newberry (solicitation KCI-Project-No.-00051564-001), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.