We post new concrete opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Work consists of alteration of an existing dam including: reservoir drawdown and dewatering; site clearing and grubbing; removal of existing outlet works; construction of a new cast-in-place reinforced concrete combination service/emergency spillway structure (horseshoe configuration); installation of new 48-inch ductile iron pipe outlet works; hand-placed riprap outlet protection. As shown on Contract Drawings. Drawings and specified herein
Delivery Method: Design-Bid-Build
Construction Cost Range: $755,000 to $825,000 Prime Contractor License (Special Standard of Responsibility): Marine (MR) license.
Documents: Will Armstrong - will@armstrongglen.com - 704-529-0345
The work consists of alteration of an existing dam including: reservoir drawdown and dewatering; site clearing and grubbing; removal of existing outlet works; construction of a new cast-in-place reinforced concrete combination service/emergency spillway structure (horseshoe configuration); installation of new 48-inch ductile iron pipe outlet works; hand-placed riprap outlet protection.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: Winthrop University (solicitation H47-9612-PD), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.