We post new plumbing opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Construction of influent structure, circular inground concrete SBR basin, stainless steel above ground sludge tank, effluent pump station, chemical feed systems, chlorine contact basin improvements, electrical/instrumentation, and related site improvements, pumps, piping, equipment, and structures. Contact for questions: Robert Whitaker, P.E. Email address: rwhitaker@summitengineeringgroup.com. Summit Engineering Group, 9601 Warren H. Abernathy Hwy, Spartanburg, SC 29301. (864) 949-1111
Delivery Method: Design-Bid-Build
Construction Cost Range: n/a Prime Contractor License (Special Standard of Responsibility): Contractors shall have a classification of WP
Documents: gteal@summitengineeringgroup.com
The work consists of furnishing all materials, equipment, and labor to construct: a new influent structure with mechanical fine screen and grit removal; a circular inground concrete SBR basin (88-foot diameter) with floating aerators and mixer; a circular stainless steel above ground sludge tank (66-foot diameter) with floating aerator; a new effluent pump station; new chemical feed systems; chlorine contact basin improvements; related site improvements, pumps, piping, equipment, and structures; and electrical and instrumentation. Additive alternates include a sludge dewatering system using rotary sludge presses (Alternate 1) and removal and replacement of floating decanters in SBR's No. 1 and No. 2 (Alternate 2).
Source: Newberry County Water & Sewer Authority (solicitation 23006), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.