criminal record from entering the facility unless the incarceration was at BCDOC within the past two years or has an open matter with the courts. All questions regarding this bid package shall be directed at: Richard A. Parks III, PE WV Engineering - President 11 King Court • Keene, NH 03431
(603) 352-7007 x105
(603) 477-8169
rparks@wvengineering.com www.wvengineering.com Project Narrative: This project consists of mechanical and plumbing improvements within the Belknap County Jail Corrections Facility to improve the performance, maintainability, and functionality of the existing building systems. The mechanical scope includes the cleaning of existing HVAC ductwork throughout the designated areas of the facility. Installation of new duct access panels at strategic locations within the duct distribution system to provide permanent access for cleaning, inspection, and future maintenance. Following the installation of the access panels, the ductwork and coils shall be thoroughly cleaned in accordance with applicable industry standards, and all access openings shall be properly sealed upon completion. Exterior air sealing of the existing ductwork at leakage areas. Miscellaneous controls improvements at the designated areas. The HVAC air systems have been tested by Hood TAB; a copy of the report will be provided for bidder review. Deficiencies noted in their report and noted on the bid drawings are to be addressed. There is no scope of work included for the existing smoke exhaust fans. The plumbing scope includes the replacement of existing plumbing fixtures with new institutional combination penal fixtures, including associated carriers, controls, and piping connections as required. Existing shower assemblies will be upgraded with new shower valves, shower heads, trim, a
The mechanical scope includes cleaning existing HVAC ductwork, installing new duct access panels, exterior air sealing, and miscellaneous controls improvements. The plumbing scope includes replacing existing plumbing fixtures with new institutional combination penal fixtures, upgrading shower assemblies with new shower valves, shower heads, trim, and related accessories, and re-surfacing existing glazed tile shower surrounds with solid surface product. All work shall be completed in accordance with approved construction documents and applicable codes.
Source: New Hampshire DAS Procurement (solicitation 9546b9dc-c483-424a-ad14-28ba54a3ee72), retrieved via the NH DAS Procurement & Support Services portal. View the official posting , always confirm requirements and deadlines with the issuing agency.