We post new hvac opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Project Scope: The Contractor shall inspect and repair mission-critical equipment at the Hanscom AFB, Massachusetts. This includes four (4) boiler units, one (1) Heat Recovery Steam Generator (HRSG), and all associated systems such as the condensate receiver tank, compressors, compressed air tanks, DA tanks, pumps, economizers, fans, the fuel train, turbines, and safety valves. The primary objective is to identify and correct deficiencies to prevent system failures.
Please see Performance Work Statement (PWS) for additional requirements.
Questions are due no later than 2:00PM EST, 26 Aug 2026. Answers will be provided no later than 28 Aug 2026. - Offers are due on or before 11:00AM EST, 2 Sep 2026. - A site visit will be held on 9:00-11:00AM, 25 Aug 2026. Please arrive by 8:15AM at Hanscom AFB Visitor Center to obtain a pass.
The Contractor shall inspect and repair mission-critical equipment at the Hanscom AFB, Massachusetts, including four boiler units, one Heat Recovery Steam Generator (HRSG), and all associated systems such as the condensate receiver tank, compressors, compressed air tanks, DA tanks, pumps, economizers, fans, the fuel train, turbines, and safety valves. The primary objective is to identify and correct deficiencies to prevent system failures.
"01731-2107""HANSCOM AFB""MA""USA""CP 781 225 0073""16 EGLIN ST BLDG 1604""FY26 Boiler Inspections (SF1449).pdf"860623"file"".pdf""1""2026-08-10T16:08:24.842+00:00""049cecbd2ef546f298242eb24b905c51""public""0""public""f103d81f42374644bd535c3a5b69d7d4""0"7"0""FY26 Boiler Inspections (Potential Offerors)1 (002).pdf"188801"file"".pdf""1""2026-08-06T12:27:15.454+00:00""6964e8567be64e2e951eadb600700752""public""0""public""ad50341363874a039cbd58aabc9eca07""0"6"0""FY26 Boiler Inspections (SF1449 Cover Letter).pdf"236043"file"".pdf""1""2026-08-05T18:05:47.748+00:00""1f917db5c523464298239ce21f25e526""public""0""public""ab55b8f585a740cfb693dc13a65c2b37""0"4"0""FY26 Boiler Inspections (Bid Schedule).xlsx"27954"file"".xlsx""1""2026-08-05T18:05:47.748+00:00""d42990789a414da28cdb5e41942d5ee3""public""0""public""164f49a54bb64e0c8d7cd8d4cf1f57a3""0"3"0""FY26 Boiler Inspections (Wage Determination)_June 2026.pdf"55246"file"".pdf""1""2026-08-05T18:05:47.748+00:00""f8c0081fbd0c4be1b423353fe0dc7b45""public""0""public""df8e54ed34ea4112a0a3fb0f5ddf89d2""0"2"0""FY26 Boiler Inspections (PWS).pdf"286713"file"".pdf""1""2026-08-05T18:05:47.748+00:00""766076dd8abd42e3b39c756114be529e""public""0""public""5ef2fba561f74978844966a7c05d921f""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 37706a41f20149bea44e20256eddf6e7), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.