We post new hvac opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The purpose of this Amendment 03 is to increase the due date by one (1) week. See updated due date for quotes.
All other terms and conditions remain unchanged.
The purpose of this Amendment 02 is to upload the Site Visit Sign In sheets. See attached sign in sheets one (1) and two (2).
All other terms and conditions remain unchanged.
The purpose of Amendment 01 is to extend the quotation due date, update the bonding requirements, clarify the submission requirements, and respond to the questions submitted during the allowable inquiry period.
All changes to the solicitation are highlighted in yellow in the updated Combined Synopsis attached to this solicitation. Responses to the submitted questions are provided in the attached Questions and Answers (Q&A) document.
All other terms and conditions remained unchanged.
This is a combined synopsis/soliciation for a contractor to replace the cooling and heating coils as described in the attached Statement of Work (SOW). Please see attached combined synopsis/soliciation, Statement of Work (SOW), Wage Determination MD20260120 (dated 6/4/26), NIST Guidelines for Contractors and A/E Firms, and the Revolutionary FAR Overhaul (RFO) Provisions and Clauses.
NIST intends to conduct a Site Visit for this requirement on 7/29/2026 at 10AM. Please see instructions detailed in the combined synopsis/solicitation. Those planning on attending must notify the CO of your inention and provide the information detailed in the attached synopsis/solicitation.
The contractor shall replace cooling water coils for AHU-1-1 and heating coils for AHUs 1-1 through 7-2 (total 4 cooling coils and 36 heating coils), including associated piping connections back to the supply and return valves. The contractor must perform field verifications, provide and install new coils, perform pre- and post-installation testing and balancing (air and water balance for all units), and insulate piping components with rotting or missing insulation to match existing. All work shall comply with Federal, State, and Local requirements, as well as current editions of IBC, ASHRAE, and applicable codes.
"US""US""20899""GAITHERSBURG""MD""USA""ACQUISITION MANAGEMENT DIVISION""100 BUREAU DR.""Sign In Page 2.jpg"1669359"file"".jpg""1""2026-08-05T15:14:19.881+00:00""7bca0d4ff7c14ac39e7fcdc0c82d1a08""public""0""public""2b6dd849d69a4ec1b13b5d224004cd27""0"11"0""sign in page 1.jpg"1769679"file"".jpg""1""2026-08-05T15:14:19.881+00:00""d7246f39160846929e251f094bb30b70""public""0""public""2bdeaa2e749e466bb1f73db50caaefeb""0"10"0""1333ND26QNB190351 Q and A.docx"25012"file"".docx""1""2026-08-04T16:41:40.304+00:00""6784a50cf5c3411f9c7063968e15da0c""public""0""public""57d987d8edb64610a2e769840afaee8b""0"9"0""Combined Synopsis Solicitation Multiple Hydronic Coils (Am 01).docx"58525"file"".docx""1""2026-08-04T16:41:40.304+00:00""59cf0ffd683943649f95ef8f161a9034""public""0""public""ea8939e8c5e64cd194b6f2670df2c100""0"8"0""Attachment E-RFO Clauses.docx"208599"file"".docx""1""2026-07-20T20:13:49.097+00:00""f046963a76ab47b7bf488d291f2c73db""public""0""public""3700923900644a7e97ce8c704f0bf3b1""0"6"0""Attachment D-RFO Provisions.docx"74989"file"".docx""1""2026-07-20T20:13:49.097+00:00""9d7a98e360ca4f6f84e1d06a3e123427""public""0""public""3ef10f9e2e994ff895bf47c381d81298""0"5"0""Attachment C-Guidelines for Contractors and A-E firms.pdf"297457"file"".pdf""1""2026-07-20T20:13:49.097+00:00""9182579e4df84c04860cc0da42e9168f""public""0""public""83bedbb1e03d47e9968cc75bfcb96af6""0"4"0""Attachment A-SOW Building 227 Multiple Hydronic Coils Replacment-x.docx"39813"file"".docx""1""2026-07-20T20:13:49.097+00:00""fe527ee9099b460b99bf0c9ae324f04b""public""0""public""0f69d8631fff4617aafc90d61b8f1467""0"3"0""Attachment B-WD-DBA.txt"16655"file"".txt""1""2026-07-20T20:13:49.097+00:00""bfd8a91947e94583aa36c77d446bf46a""public""0""public""1db615a19c7a4854be0164e4f6f1c484""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 6e4f52ff3a2f41698b8fb04cb29d74c2), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.