We post new it & software opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
PROJECT DESCRIPTION
This contract involves the iterative development and evaluation of a smartphone application
(APP) for older drivers, specifically targeting the safety and mobility needs of individuals aged
65 and older. The work entails the translation of research findings into a functional software
prototype for both iOS and Android platforms.
The project scope encompasses the complete design lifecycle, including:
iterative designs optimized for older drivers' cognitive and physical requirements, with
particular attention to aspects of distraction during the dynamic driving task.
usability testing with a sample of older drivers.
including naturalistic driving protocols and regulatory documentation (e.g., IRB, ICR,
and PTA drafts), to support future performance assessments.
methodology, testing outcomes, and recommendations for future iterations.
concept to a pilot-tested prototype ready for large-scale field evaluation.
The contractor shall furnish necessary personnel, equipment, and facilities to execute a Time & Materials (T&M) contract for developing a smartphone application for older drivers. The scope includes: 1) UI/UX development creating wireframes and iterative designs optimized for older drivers' cognitive and physical requirements; 2) Prototyping and pilot testing, building a functional APP prototype and conducting usability testing with a sample of older drivers; 3) Research design, developing a detailed Field Operational Test (FOT) framework including naturalistic driving protocols and regulatory documentation (e.g., IRB, ICR, and PTA drafts); 4) Technical documentation, producing comprehensive reports detailing design methodology, testing outcomes, and recommendations; 5) Managing technical transition from initial wireframe concept to a pilot-tested prototype ready for large-scale field evaluation. The contractor must also conduct a Kickoff Meeting, submit a Work Plan, draft APP design, conduct wireframe testing, build and pilot test the prototype, submit a FOT design, and produce a final report.
"US""US""20590""WASHINGTON""DC""USA""OFFICE OF ACQUISITION MANAGEMENT""1200 NEW JERSEY AVE SE, ROOM W51-30""101 693JJ926R000007 Q and A NHTSA Response 7.29.2026_.pdf"332848"file"".pdf""1""2026-07-29T21:37:06.219+00:00""3311f92f841346d292a788cc80b47d14""public""0""public""0a7341f850054231bdde252620246d79""0"8"0""101 Older Driver Smartphone App RFP 693JJ926R00007_ 7.14.2026.pdf"809146"file"".pdf""1""2026-07-14T17:33:32.209+00:00""5567902f4fba4a4c8b362ad3281d7fe0""public""0""public""8b8a1aeede8b4fe3babf944992d50ae8""0"7"0""J.2 Other Direct Cost Breakdown Spreadsheet.xlsx"12098"file"".xlsx""1""2026-07-14T17:20:19.137+00:00""843b563899c344e6b42d02abdea17fb2""public""0""public""e529bea09d8841639392bdda96e34554""0"5"0""J.5 SFLLL_1_2-V1.2.pdf"180371"file"".pdf""1""2026-07-14T17:20:19.137+00:00""69c423b8b8a34135ba030a360abc9881""public""0""public""1a8b942c6ef241d39933eacfb97e00f6""0"4"0""J.3 Subcontracting Checklist.docx"20554"file"".docx""1""2026-07-14T17:20:19.137+00:00""1a4e7439a48f4ed08673ee5f664f6f97""public""0""public""51ac1a59b9f9417eaa124030e25685ab""0"3"0""J.1 Cost Proposal Template (T&M).xlsx"16067"file"".xlsx""1""2026-07-14T17:20:19.137+00:00""3e33c3568204413197b743dfa880d4e8""public""0""public""46ab611b42e445ba9575d180bd689ef7""0"2"0""J.4 Travel Spreadsheet.xlsx"13001"file"".xlsx""1""2026-07-14T17:20:19.137+00:00""d3b2d38a98a4419b9b224071ecc92c96""public""0""public""0ebafe05708e4bbd9afe0ea5af747786""0"1"0"Source: SAM.gov (notice 2318230ad7f54f0c87a6e8d334220041), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.