We post new bathroom opportunities in Tennessee as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Solicitation # 36C24926R0074, Project # 603-26-107 Design-Build to Convert A-412 Into Bathroom
The contractor shall provide all labor, materials, tools and equipment, and design-build services necessary for design and construction of converting A-412 into a bathroom. Work includes demolition, infection control, submittal process, supervision, dumpsters, job-site office equipment, safety and first aid-ICRA, final cleaning, punchlist/closeout, site work demolition, wood/plastics/composites, thermal and moisture protection, finishes (including schedule for finishes, non-structural metal framing, gypsum board, acoustical ceilings, resilient sheet flooring, resilient tile flooring, painting), accessories (signage, wall and door protection), conveying equipment, fire suppression (wet-pipe sprinkler systems), HVAC (common work results, general motor requirements, insulation, refrigerant piping, decentralized VRF equipment), electrical (requirements, low-voltage conductors, grounding, raceways, panelboards, wiring devices, enclosed switches), communications (requirements, grounding, raceways), and electronic safety and security (fire detection and alarm). The contractor shall also comply with general requirements including safety, security, operations and storage areas, alterations, disposal and retention, protection of existing vegetation, restoration, as-built drawings, warranty management, use of roadways, temporary toilets, availability and use of utility services, tests, instructions, government-furnished property, relocated equipment/items, storage space, construction sign, safety sign, photographic documentation, final elevation digital images, historic preservation, and VA KAHUA PMIS.
"US""37129""MURFREESBORO""TN""USA""VISN 9 CONSOLIDATED ACQUISITION""3400 LEBANON ROAD""S02 Solicitation Attachment-Price Schedule.xlsx"20658"file"".xlsx""1""2026-07-23T19:39:14.215+00:00""f39bdafcd8634a5881a1af686e6f1be1""public""0""public""936656b7578d46b192eea3d2b4d3b46b""0"8"0""S02 Past Performance Questionaire.pdf"674358"file"".pdf""1""2026-07-23T19:39:14.215+00:00""e4045ca7b5504faf99b2d252fd337e4d""public""0""public""dc79e5dbd1554cc1a6de3ebf7dd797c5""0"7"0""S02 SCA Wage Determination 2015-4717.pdf"111068"file"".pdf""1""2026-07-23T19:39:14.215+00:00""4f7b3880e20847618976a49cab636944""public""0""public""33c118c01198452098ec3f54fd5b874d""0"6"0""S02 DBA Wage Determination KY20260093 5-18-2026.pdf"70594"file"".pdf""1""2026-07-23T19:39:14.215+00:00""9b560aeaded74e259c773f74fce7862c""public""0""public""10a01afd686d4317839df007b7110bf2""0"5"0""S02 Floorplan 603-26-107.pdf"60838"file"".pdf""1""2026-07-23T19:39:14.215+00:00""099bbe9d048a4e4f8864e25a4ec60f23""public""0""public""dad2a449fa8c402f98e59403d560a5f9""0"4"0""S02 000110 Table of Contents.pdf"239627"file"".pdf""1""2026-07-23T19:39:14.215+00:00""d44ae6908db04c33997bfd5a4008c12b""public""0""public""7a250c13af8c4c2b8acd2a004df89ca6""0"3"0""S02 010000 General Requirements.pdf"313329"file"".pdf""1""2026-07-23T19:39:14.215+00:00""36cef49b88b04edab164e87abdc8f833""public""0""public""a45dc653bf494a9e9c7b71a2aede3de6""0"2"0""36C24926R0074_1.docx"136263"file"".docx""1""2026-07-23T19:39:14.215+00:00""d1c0b239cff847c1b833be719cebd59a""public""0""public""5a7de3340d4e4813809af127bee13ace""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice ed481bf171504eacbc3fc5d0c7791410), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.