The general scope of this project is to remove the existing three (3) 40,000-gallon fuel tanks and one (1) 7,500-gallon spill connection tank and replace them with appropriately sized modern tanks and to replace the monitoring/control systems to improve maintainability, meet the backup fuel supply requirements, and meet regulatory compliance requirements.
The Buffalo VAMC requires a Contractor to perform the construction work necessary to accomplish this goal. The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work under this effort is fully described in the project drawings and specifications. Additional administrative and management related requirements are described throughout this document. A brief overview of the construction work will be included with SOW in the solicitation. See SOW and Solicitations documents
The Contractor shall provide all supervision, labor, services, tools, equipment, and materials required to perform work. Work includes general construction, alterations, demolition, utility replacements, fueling systems, mechanical work, electrical work, plumbing work, structural work, site work, erosion and sediment control, laboratory testing, and any other work specified in the drawings and specifications for the complete completion of the Fuel Oil Tank Replacement Project. Specific bid items include: providing temporary fuel (minimum of 16,000 gallons), temporary power and utilities for building 7, excavation and removal of existing tanks, removal of existing tunnel structure between building 6 and building 7, procurement and installation of a new tunnel and new fuel tanks, start up and commissioning of all systems, and restoration. Estimated quantities include removal of 200 cubic yards of petroleum impacted soil, 16,000 gallons of additional No. 2 fuel oil, and 33 soil samples for UST removal. The project also includes a Bid Deduct option to remove ECC/Office Work.
"US""12208""ALBANY""NY""USA""113 HOLLAND AVE""S02 - 36C24226B0057 0003 SOLICITATION - FUEL OIL TANK REPLACEMENT - BUF.docx"36157"file"".docx""1""2026-08-07T18:43:50.643+00:00""2afc4679cf8542e7b46f5f47522d168e""public""0""public""a3dacc30cd36459a96da8f78cec26e9b""0"44"0""528-18-110 Bid RFI Responses REV 2 - 8-7-26_.docx"144676"file"".docx""1""2026-08-07T18:43:50.643+00:00""db4174bb110044629d6eed62a85ec7ea""public""0""public""83d722610bfe4612a01474022dc93406""0"43"0""528-18-110 Fuel Oil Tank Pre Bid Walkthrough 2 Sign-in 7.28.26.pdf"226697"file"".pdf""1""2026-08-07T18:43:50.643+00:00""b2c1310be9494f0aaf78090d18424103""public""0""public""4d1c3e287da54c819509a3b60fb52fb1""0"42"0""2861 - Dwg 32-01-04 - Sht 090 of 217 - Utility Wing - Sub Basement Framing Plan - 1949.12.19.pdf"7680594"file"".pdf""1""2026-08-07T18:43:50.643+00:00""f648829137a741a79ecb4193ce6091af""public""0""public""a9cfc2f6cfaa41cab11d15de96861e84""0"39"0""141701613_001.pdf"112076"file"".pdf""1""2026-08-07T18:43:50.643+00:00""b7cd7f0876294ead8fa685a7bc4be503""public""0""public""8e0b8b2df4464a5aa4b8e0142da36462""0"38"0""201703536_002.pdf"234237"file"".pdf""1""2026-08-07T18:43:50.643+00:00""2511f759256e4bdeb8d22def84ad204c""public""0""public""2986b88bc3664141b77134ae00b0738f""0"33"0""S02 - 36C24226B0057 0002 SOLICITATION - FUEL OIL TANK REPLACEMENT - BUF.docx"36119"file"".docx""1""2026-07-28T14:40:43.037+00:00""0ad43ed03c854999a6de543053d0f2e4""public""0""public""8478c8c68ba24688954fd76110a229db""0"23"0""528-18-110 Bid RFI Responses REV 1 - 7-27-26.docx"48480"file"".docx""1""2026-07-28T14:40:43.037+00:00""f6a806c02c73412999295cab7b354ebe""public""0""public""bee96317bfca4b6e80ce28ed5a0a6eb7""0"22"0""S02 - 36C24226B0057 SOLICITATION - FUEL OIL TANK REPLACEMENT - BUF.docx"302547"file"".docx""1""2026-07-02T13:51:29.385+00:00""d2a812194ac341ddb754a0203b8fd235""public""0""public""973820a45a4f42cc9a19a79de01764e2""0"20"0""528-18-110 - Final Specifications.pdf"5422155"file"".pdf""1""2026-07-02T13:51:29.385+00:00""7586ac472d7d48fe959f471557461532""public""0""public""ae68febcd6e7423c97d0daa00ab147a8""0"19"0""528-18-110 Construction Bid Drawings March 2026.pdf"80722549"file"".pdf""1""2026-07-02T13:51:29.385+00:00""5bb0948f8aac48048e7b42d8218db4ea""public""0""public""eba44cf4106d427c8a8b23595647a767""0"18"0""P07 - WAGE DETERMINATION.pdf"58224"file"".pdf""1""2026-07-02T13:51:29.385+00:00""d13fbabe7c754c9e93a1479e3d3808dd""public""0""public""510aeb2a616d4f2cbab514cfb67ace3f""0"8"0""BUY AMERICAN ACT CERTIFICATE 52.225-2.pdf"69524"file"".pdf""1""2026-07-02T13:51:29.385+00:00""3a03901edb59414e9f23514c2f815e85""public""0""public""cb925db0ee3d4ca9a49288d4fce42d17""0"5"0""LIMITATIONS OF SUBCONTRACTING CERTIFICATE 852.219-75 - blank.pdf"77944"file"".pdf""1""2026-07-02T13:51:29.385+00:00""e4ec8b6744a64bd9880f2d28c7f7f0e0""public""0""public""80e048d6a3d542c09b2df95f372b3e94""0"4"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.