504-26-006 - Re Finish B4 N and F Adm
The contractor shall provide all labor, supervision, materials, and equipment to replace and install approximately 1200 sq/ft of new LVT flooring and cove base in Building 4 Food and Nutrition Administration at the Amarillo VA Health Care Facility. Work includes demolition of existing flooring and cove base, proper disposal of waste, floor preparation (cleaning, leveling, repairing imperfections), and installation of new LVT flooring (28-40 mils thick, natural gray oak color, manufactured in the USA) and a standard 4" x 1/4" rubber cove base with matching vinyl transitions. The contractor must provide submittals and samples, coordinate with VA staff, comply with ICRA requirements, and complete the work within 45 days of receiving Notice to Proceed.
We post new flooring opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""78240""San Antonio""TX""USA""5441 Babcock Road""Suite 302""36C25726Q0431 0002 Final.docx"115474"file"".docx""1""2026-09-23T16:06:26.833+00:00""3eb7babbbbe2476c97ae1e82584ec4dd""public""0""public""cf991de0d0fc4154b0fb2d6ed47f9dc6""0"5"0""36C25726Q0431 0001 final.docx"116304"file"".docx""1""2026-09-16T19:13:52.318+00:00""ceca5d750e094cbca769a0c2fdec091d""public""0""public""4ee5d640d9fe4b1694a1b7359246d94c""0"4"0""36C25726Q0431.docx"284642"file"".docx""1""2026-09-12T14:48:46.828+00:00""1a721298dbc744a4be1b949f5d5c7125""public""0""public""250b419d931647c8a580754f82bd0c81""0"2"0""504-26-006 VHA ICRA Jan 3 2025 ICRA.pdf"403604"file"".pdf""1""2026-09-12T14:48:46.828+00:00""560daae0cd3542bfa12057189a1b9ecc""public""0""public""06cb74bc007943e9a6bb63203f30d71f""0"1"0""504-26-027 F and N Flooring PCRA.pdf"514707"file"".pdf""1""2026-09-12T14:48:46.828+00:00""f75748bc673b4268ba119c4cd70211bc""public""0""public""6bbc95315c6849d2ab7fe4753df43385""0"1"0"Most Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice ba23f0c083954f728a63977bd17275f1), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.