We post new electrical opportunities in Wisconsin as agencies publish them. Get them in one email — free, and unsubscribe whenever.
None
The contractor shall furnish all labor, materials, equipment, and supervision to convert the North Campus electrical distribution system from a radial system to a composite primary loop radial system. This includes adding and replacing pad-mounted electrical distribution equipment, underground medium voltage feeders, and associated fittings; trenching and installing new duct banks; integrating a kirk-key interlock system; adding current transducer fault indicators; and providing detailed project phasing, sequencing, and outage planning. The work also includes a thorough utility survey and must be completed within 410 calendar days following the Notice to Proceed.
"US""53214""MILWAUKEE""WI""USA""GREAT LAKES ACQUISITION CENTER""115 S 84TH ST""S06 - Pre-bid_Site Visit Sign-in Sheet Complete 695-22-123.pdf"231915"file"".pdf""1""2026-08-05T20:25:22.187+00:00""7837c2c9e7e645198e20285620a27c5c""public""0""public""e7092f63bd0f4a18b0105761bc1c735e""0"13"0""36C25226B0023 0002.docx"27277"file"".docx""1""2026-08-05T20:25:22.187+00:00""74aa23cacd8d4b81bea749e22c91d002""public""0""public""57a39220ab2f44fa9812adcf627d83c3""0"12"0""36C25226B0023 0001.docx"19384"file"".docx""1""2026-07-27T17:01:06.943+00:00""ae4d5e27cb834dce82c266f70ad7e74f""public""0""public""dcbfeb9af8894102b78ee10ba800270f""0"11"0""S02 - VA NOTICE OF LIMITATIONS ON SUBCONTRACTING_CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION_REQUIRED TO COMPLETE.pdf"143440"file"".pdf""1""2026-07-23T14:55:34.096+00:00""a4bb33b80fc84bdfa4f2bea358337c06""public""0""public""3bc75764f0454e4a8126ffa8205e2fe9""0"10"0""S02 - Milwaukee_VAMC_Map_Site Visit Location.pdf"1008638"file"".pdf""1""2026-07-23T14:55:34.096+00:00""f170ca8e366f4bb98cf473b54bfa5fce""public""0""public""bf83f7206c4b4a0a874558a8fd3234f2""0"9"0""S02 - Wage Determination WI20260001 01022026.pdf"80137"file"".pdf""1""2026-07-23T14:55:34.096+00:00""5317172eb3d0453395cd05ba0c2b6d8e""public""0""public""ea6da3901faf48e3afb15dfe69310e10""0"8"0""S02 - 695-22-123 SOW.pdf"195171"file"".pdf""1""2026-07-23T14:55:34.096+00:00""210f1385a48841b38f353cd804657094""public""0""public""7fed66b43c984f599cde7134bae6e126""0"7"0""S02 - 695-22-123 Specifications.pdf"2311013"file"".pdf""1""2026-07-23T14:55:34.096+00:00""4d601dca79994553bf3252952b52d523""public""0""public""584e2178d91c4fcf84289aea1430963a""0"6"0""S02 - 695-22-123 Drawings Part 4 of 4.pdf"15992511"file"".pdf""1""2026-07-23T14:55:34.096+00:00""73664ab1c2804c2f977ff2f41ac2f7c7""public""0""public""bd325d3b38974d688733d0fd33a76529""0"5"0""S02 - 695-22-123 Drawings Part 3 of 4.pdf"16710052"file"".pdf""1""2026-07-23T14:55:34.096+00:00""0013f0cfe3c44ad880b4355178d97402""public""0""public""72f3861820064ace989c1403c7e22d87""0"4"0""S02 - 695-22-123 Drawings Part 2 of 4.pdf"16698296"file"".pdf""1""2026-07-23T14:55:34.096+00:00""1ef7e5fb1a2642b884b2dadd1c02fc0e""public""0""public""c55d750fd66840d6a983c0e36acfad7d""0"3"0""S02 - 695-22-123 Drawings Part 1 of 4.pdf"16200061"file"".pdf""1""2026-07-23T14:55:34.096+00:00""790a65b035754f9cbccfd1b0c5146d66""public""0""public""ac99d7da60f84f1492a4eba851b2abcc""0"2"0""36C25226B0023_2.docx"229912"file"".docx""1""2026-07-23T14:55:34.096+00:00""45db6e561e3e472c8a59af089e73061f""public""0""public""77e531e2dc53412d8c869228bd831363""0"1"0"Source: SAM.gov (notice b9a6b663b279480e98dd0f993add969d), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.