The Performance Work Statement (PWS) defines the requirements for a non-personal services contract to provide Preventive (PM), Unscheduled (UM), and Emergency Maintenance (EM) for the Defense Commissary Agency (DeCA) Vogelweh Headquarters in Germany. The contractor is responsible for providing all qualified labor, management, materials, and specialized tools to ensure the continuous, safe, and compliant operation of all facilities, infrastructure, utilities, and refrigeration systems.
Maintenance & Response Protocols:
PM: Requires a 100% initial equipment/refrigerant inventory (updated semi-annually) and execution of scheduled checks.
UM: Detailed cost estimates must be submitted via the online Service Order Management System (SOMS) within 14 days, with repairs completed within 45 days of approval.
EM: Operates 24/7/365 with a 3-hour on-site response time. Repairs under €3,000 must be mitigated or fixed immediately; those exceeding €3,000 require immediate COR coordination.
Systems & Data Integrity: All work orders, inventories, and billing must be managed via SOMS. Documentation must be fully compatible with Microsoft Office, and all communication, logs, and briefings must be in English.
Environmental & Liability Standards: The contractor is strictly liable for refrigerant management, requiring detailed tracking for units with greater than or equal to 3kg of gas and an annual leak report due every January 30th.
Quality & Warranties: Fully incorporates EU Directive 2019/771, providing a 2-year legal guarantee on all parts and installations. Non-conforming work must be corrected within 7 days, or the work order faces cancellation without payment.
The contractor shall provide Preventive Maintenance (PM), Unscheduled Maintenance (UM), and Emergency Maintenance (EM) for DeCA's Vogelweh Headquarters buildings and equipment. PM requires a 100% initial equipment/refrigerant inventory and execution of scheduled checks. UM requires detailed cost estimates submitted via SOMS within 14 days, with repairs completed within 45 days of approval. EM operates 24/7/365 with a 3-hour on-site response time; repairs under €3,000 must be mitigated or fixed immediately, while those exceeding €3,000 require immediate COR coordination. The contractor must manage all work orders, inventories, and billing via SOMS, and is strictly liable for refrigerant management with an annual leak report due every January 30th. The contract incorporates EU Directive 2019/771, providing a 2-year legal guarantee on all parts and installations.
"09021#""APO""AE""USA""CONTRACTING OFFICE, NON-RESALE""UNIT 3060, BLDG 2780 KAPAUN AIR STA""A.09.01 Combined Synopsis Solicitation (HQ Buildings Maintenance).pdf"581558"file"".pdf""1""2026-08-06T17:44:50.204+00:00""93b9ce58e91d4f6a91fe618da90fa612""public""0""public""b43983248c3141c3aa2a7d261b2101f3""0"10"0""A.09.01.04 Annex D Inventory label instructions HQ.pdf"136801"file"".pdf""1""2026-08-06T17:44:50.204+00:00""aff1d9e876f44c59aa40a5caf0b45d36""public""0""public""39d6d454053841baa05ee20450bf58b5""0"9"0""A.09.01.05 Annex E Emergency Criteria HQ.pdf"104265"file"".pdf""1""2026-08-06T17:44:50.204+00:00""180aef4bdc114a2eb68574dfe7602fc2""public""0""public""8c1652f0ac0e445888efc0c61b501a74""0"8"0""A.09.01.06 Annex F Inventory change instructions HQ.pptx"89179"file"".pptx""1""2026-08-06T17:44:50.204+00:00""0c41df987eee47e5899e8f3495858429""public""0""public""e565fe8ee9044270927c5742f781d6d2""0"7"0""A.09.01.10 Combined Synopsis Attachment 2 Pricing Worksheet.xlsx"27363"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""f325b636ecf445ba9f3eeb368aa7ecd5""public""0""public""9a8951f2a1394252ad11c63e6427d3ae""0"6"0""A.09.01.09 Combo synopsis Attachment 1 Sample Work Orders Past 2 years.xlsx"13053"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""4a9ea00a855e47e29b2e77bbd26c6c56""public""0""public""24af8898528f4a7ebaa344dbf3ec531f""0"5"0""A.09.01.08 Annex H Performance Requirement Summary HQ.xlsx"12719"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""cb6cb400b5114d02bc9433459031a740""public""0""public""47367a3680574b25bbf04584d1562638""0"4"0""A.09.01.03 Annex C current inventory HQ.xlsx"16290"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""474c065ca4ab4a4c98831a207a12ee84""public""0""public""5e4364bec4c7446f8b1998cfc40ab05a""0"3"0""A.09.01.01 Annex A Items that may require repair HQ.xlsx"13301"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""a513f54f200b4cc296e93aaf2098be8c""public""0""public""dfaa6b1f654d423ab7add17b6f02c0d6""0"2"0""A.09.01.02 Annex B items excluded from contract HQ.xlsx"15325"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""ef048efdf25a4e049c44ff53443c74bf""public""0""public""619cc15871594ce28de8295eb2e751ac""0"2"0""A.09.01.07 Annex G delivery matrix HQ.xlsx"9623"file"".xlsx""1""2026-08-06T17:44:50.204+00:00""c30803aaf2d448ecbc55f922bd857e49""public""0""public""3e1a2cbfc7ac4eecb7f22a41fc3c5ce8""0"1"0"Source: SAM.gov (notice a28b21c235284dc3a9a4796b6647b1a8), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.