Install approx. 9,941Install approximately 9,941 linear feet (LF) of new 12” watermain PVC DR18 by open cut. Install approximately 11,732 linear feet (LF) of new 10” forcemain PVC DR18 by open cut. Install approximately 2,199 LF of new 12-inch forcemain HDPE DR-11 by horizontal directional drill (HDD). Install approximately 341 LF of new 16-inch watermain HDPE DR-11 by horizontaldirectional drill (HDD).Install approximately 310 linear feet (LF) of new 10” forcemain PVC DR18 by jack and bore.
Delivery Method: Design-Bid-Build
Documents: Four Waters Engineering: kbleuer@4weng.com
Install approximately 9,941 linear feet (LF) of new 12” watermain PVC DR18 by open cut. Install approximately 11,732 linear feet (LF) of new 10” forcemain PVC DR18 by open cut. Install approximately 2,199 LF of new 12-inch forcemain HDPE DR-11 by horizontal directional drill (HDD). Install approximately 341 LF of new 16-inch watermain HDPE DR-11 by horizontal directional drill (HDD). Install approximately 310 linear feet (LF) of new 10” forcemain PVC DR18 by jack and bore.
Source: Town of Ridgeland (solicitation RFP-2026-06), retrieved via a public procurement portal. View the official posting , always confirm requirements and deadlines with the issuing agency.