We post new electrical opportunities in Delaware as agencies publish them. Get them in one email — free, and unsubscribe whenever.
7/21/26 Addendum 1 Posted; Pre-Bid Meeting Sign-In Sheet Posted; Questions and Answers Posted; Geotech Report, Common Room Location, Elec Room & Schedule, and Floor Plan & Wall Sections Posted
Solicitation documents: RFP - Public Works, Referenced Documents, Plans, FTA Required Documents, OJT Guidelines, Appendix A, Steel Cost Form, Pre-Bid Meeting Sign-In Sheets, Addendum 1, Questions & Answers, Geotech Report, Common Room Location, Elec Room & Schedule, Floor Plan & Wall Sections.
The improvements consist of furnishing all labor and materials for the installation of solar panels on canopies over the bus parking lot at the DTC Dover Operations and Administration Facility. The project constructs 47,850 SF of steel framed canopy with a galvanized metal roof that will hold 384 solar panels. The system includes one - 1.1 MWh batteries creating a Battery Energy Storage System (BESS) and a Smart Energy Control Center (ECC) to remotely charge buses. A Microgrid Control System will allow remote monitoring. There is LED lighting under the canopy. 70 bus parking spaces must be reconfigured for the canopy system. The bus parking lot will need to be fog sealed and striped. The site must be kept operational for bus traffic and maintenance at all times. The contractor is responsible for all necessary permits.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: State of Delaware (MyMarketPlace) (bid 9241), retrieved via the Delaware MyMarketPlace bid board. View the official posting , always confirm requirements and deadlines with the issuing agency.