We post new electrical opportunities in Massachusetts as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project includes the modernization of twelve (12) combination electrical and communications floor boxes serving Level 3 Ballroom at the Hynes Convention Center. Work includes de-energizing and disconnecting existing electrical floor box circuits; selective demolition of existing floor boxes and associated floor drain bodies, traps, branch drain lines, and vent piping, with abandonment and capping of existing connections.
Pre-Bid Conference: A prebid conference will be held at 10:00am on August 5, 2026, starting at the Boylston Street entry lobby of the John B. Hynes Veterans Memorial Convention Center located at 900 Boylston Street.
The project includes de-energizing and disconnecting existing electrical floor box circuits; selective demolition of existing floor boxes and associated floor drain bodies, traps, branch drain lines, and vent piping; and abandonment and capping of existing connections.
Source: COMMBUYS (Massachusetts) (bid BD-27-1208-MCCA1-MCCA1-131740), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting , always confirm requirements and deadlines with the issuing agency.