Remove the two existing failed HTP boilers and install two new HTP ELX-400FBN boilers. One boiler will be set up to run a heating loop to an indirect hot water storage tank. The second heating boiler will be programmed for hot water priority.
Pre-Bid Conference: There is a mandatory site visit on 8/6/2026 at 10am. Interested contractors should email Barry Johnson, at barry.j.johnson22.nfg@army.mil to request attendance. Attendees must be REAL ID compliant.
Work includes removing the two existing failed HTP boilers and installing two new HTP ELX-400FBN boilers. One boiler will be set up to run a heating loop to an indirect hot water storage tank. The second heating boiler will be programmed for hot water priority. The contractor must provide all labor, tools, and equipment necessary to complete the scope of work.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: COMMBUYS (Massachusetts) (bid BD-27-1069-MILDV-30000-131696), retrieved via the Massachusetts COMMBUYS open-bids board. View the official posting , always confirm requirements and deadlines with the issuing agency.