Tranquil Shores, LLC is requesting bids to construct a complete in place public water supply system in accordance with the TCEQ approved design set. The public water supply system will be centered around an existing public supply well. The scope includes but is not limited to site preparation, building construction, concrete placement, buried waterline installation, primary electrical service, electrical distribution, electrical controls, booster pump installation, ground storage and hydropneumatic tank installation, fencing, backup power installation, and finish grading.
All questions regarding this component of the project should be posted through CIVCAST.
Type of work: Public Water Supply Plant construction
Engineer's estimate: 250,000
Pre-bid meeting: September 29, 2026 at 11:00 AM (Chicago) — 10709 Cow Creek Road, Marble Falls, Tx 78654
Bid opening: October 28, 2026 at 12:00 PM (Chicago)
Questions due: October 6, 2026 at 12:00 PM (Chicago)
Questions asked: 2
Bid documents (download requires a free CivCast account):
The scope includes but is not limited to site preparation, building construction, concrete placement, buried waterline installation, primary electrical service, electrical distribution, electrical controls, booster pump installation, ground storage and hydropneumatic tank installation, fencing, backup power installation, and finish grading.
We post new general contractors opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>The Sign in sheet has been uploaded</p>""7031ae90-f635-4e30-b1c2-b3edc6b676bd""2026-10-05T16:00:34.197Z"false"<p>1. According to correspondence letters between the TCEQ and the original Well design engineer, the pump specified for the well is a Grundfos 22SQ10-190, 3HP. An inquiry has been made to the driller as to which pump was installed.</p><p></p><p>2. The control box is expected to be replaced by an integrated panel as shown on the drawings.</p><p></p><p>3. There is no blank liner used on the project since no new well is being drilled.</p><p></p><p>4. A metallic building is what was specified in the design package. Eave shall be sufficient to allow for the 8’ overhead door. A metallic building shall have a metallic roof. The metallic building contractor shall provide the building design. Building color will be selected by the owner during the submittal phase. Shop heaters were not specified.</p><p></p><p>5. The intruder resistant fence shall be 7’ in height in accordance with Section 02825 of the Technical specifications.</p><p></p><p>6. The electrical plans include provisions for transducers being installed in the firewater tanks by the Public Water Supply Contractor. See Addendum.</p><p></p><p>7. The pressure tank shall bear the stamp to confirm it meets the requirements of ASME Section VIII Division I.</p><p></p><p>See Sight glass call out on Figure 8. Solenoid valves may or may not be needed depending on piping configuration and air compressor.</p><p></p>""e49bd7d4-d2ad-44ef-825e-85a9fe8b8bbb""2026-10-06T20:24:42.422Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aaae19e070a2ef9529e7711), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.