Bids are invited for several unit price items of work, including a new contact stabilization unit, rehabilitation of existing contact stabilization unit, master lift station rehabilitation, and required appurtenances.
Type of work: construction
Engineer's estimate: $3,309,800.00 - $3,135,600.00
Bid opening: October 27, 2026 at 3:00 PM (Chicago) — Reno City Hall, 160 Blackburn Street, Reno, TX 75462
Questions due: October 7, 2026 at 12:00 AM (Chicago)
Questions asked: 22
Bid documents (download requires a free CivCast account):
Bids are invited for several unit price items of work, including a new contact stabilization unit, rehabilitation of existing contact stabilization unit, master lift station rehabilitation, and required appurtenances.
We post new excavating opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"<p>Myers can be considered an approved equal. However, Hayter Engineering will not review individual pump information prior to bid opening. Pump approval will be required during the submittal process after the project has been awarded.</p>""c4938120-7a0e-458a-a3a4-5b3ba46b358f""2026-10-05T12:33:02.236Z"false"<p>HOMA can be considered an approved equal. However, Hayter Engineering will not review individual pump information prior to bid opening. Pump approval will be required during the submittal process after the project has been awarded.</p>""e3da84dc-3be9-4d7e-a5da-960bd9aed4fe""2026-10-05T12:33:22.919Z"false"<p>HOMA can be considered an approved equal. However, Hayter Engineering will not review individual pump information prior to bid opening. Pump approval will be required during the submittal process after the project has been awarded.</p>""9cc3b755-f8a8-4c58-bace-ad6de4ce6439""2026-10-05T12:33:41.759Z"false"<p>Barnes can be considered an approved equal. However, Hayter Engineering will not review individual pump information prior to bid opening. Pump approval will be required during the submittal process after the project has been awarded.</p>""ff1b0c6d-c685-4d7d-a491-3053b6d73cd4""2026-10-05T12:33:56.508Z"false"<p>Grundfos can be considered an approved equal. However, Hayter Engineering will not review individual pump information prior to bid opening. Pump approval will be required during the submittal process after the project has been awarded.</p>""7f26ac3a-6e98-4914-97a9-d74a778082e9""2026-10-05T12:34:09.082Z"false"<p>Please refer to page 9 of the Contract Drawings for the procedure of cleaning the sludge and water out of the existing contact stabilization unit prior to rehabilitation. Exact quantities are unknown, assume the structure is full.</p>""8546092c-5971-4764-b6c9-59abdfa5c010""2026-10-05T12:34:28.123Z"false"<p>14” C900 DR 25 will be approved for the effluent yard piping.</p>""0e509612-d5d4-4b07-af5f-cce161d60baf""2026-10-05T12:34:41.571Z"false"<p>6” C900 DR 25 & 8” C900 DR 25 will be approved for the waste sludge & drains for the Contact Stabilization Unit. </p><p></p><p>14” C900 DR 25 will be approved for the effluent yard piping. </p>""6e41fe17-a99c-41ad-a947-0fe64ea84f46""2026-10-05T12:36:25.695Z"false"<p>Hydromatic or Ebara can be considered an approved equal. However, Hayter Engineering will not review individual pump information prior to bid opening. Pump approval will be required during the submittal process after the project has been awarded. </p>""f35a2b08-ec2c-4b57-b573-4acd9ba960de""2026-10-05T12:37:36.998Z"false"<p>Yes, the piping inside the blower building can be reused. Please refer to Proposed Control Building Layout(Page 13 of the Contract Drawings) for details. </p>""9c8ef955-89d4-4655-b2af-b58321440519""2026-10-06T16:33:50.008Z"false"<p>No, new concrete blower pads are not required. Please refer to Section B-B (Page 13 of the Contract Drawings) for blower pad details. </p>""1d189814-8087-4201-89f1-2ed2c14f15ce""2026-10-05T13:27:47.624Z"false"<p>There is a 17’ wide gate at the end of CR 42510, to the plant. The ROW width is estimated to be 40’ wide along CR 42510.</p>""2972bc22-aa0f-4306-941c-5fc03c5fb8a5""2026-10-05T14:45:28.283Z"false"<p>Yes, landline phone service is available at the plant site. </p>""e44466c4-69d5-46bc-b7f4-ede170c33670""2026-10-05T13:28:18.136Z"false"<p>Bid item N6 is intended to include the price for required piping & fittings inside the control building. Any piping & fittings required outside of the control building, should be included in yard piping on bid item N1. Diffusors and required piping for the contact stabilization unit should be included in N3.</p>""86048165-b650-43a3-8c58-6accfeecc55f""2026-10-06T16:12:06.14Z"false"<p>During the heat of the summer, there was very little water. Currently, the pond is approximately ¼ full. The normal surface elevation is unknown. </p>""089c9ff5-a004-4e3a-b4ba-c5838f8fda34""2026-10-06T15:23:07.86Z"false"<p>Yes, the 4” GIP is to be reused and connected to the new blower piping using flange coupling adapters. The existing 4” connection to the 10” CIP is to be maintained. </p>""e8a7b2dc-5af7-498b-9062-86e3c0d8ec62""2026-10-05T14:45:14.209Z"false"<p>Rodney Hunt can be considered an approved equal. However, Hayter Engineering will not review individual slide gate information prior to bid opening. Slide gate approval will be required during the submittal process after the project has been awarded.</p>""1318d172-2594-463d-81fc-7109a5479284""2026-10-06T15:24:32.522Z"false"<p>The Concrete Technical Specification only applies to non-structural applications (i.e. sidewalks, equipment pads), see page 76 of the Contract Documents for clarification. Addendum #1 will include a revised structural drawing with the approved type of concrete. </p>""686799d1-870e-424f-9705-4d166686cbe1""2026-10-06T16:13:42.633Z"false"<p>Based on the plan view on page 13 of the contract drawings, the two blowers from the left will remain in the project if bid item DA8 is awarded. The existing blower on the far right and piping will remain in place and will not be replaced.</p>""0d6ce9d6-a3f1-499b-a6da-d55a8d70fafc""2026-10-06T16:11:50.041Z"false"<p>The brand for SWBD-1 is Square D.</p>""d942e467-bd4d-4c39-9396-3c73e4767e13""2026-10-06T20:08:36.236Z"false"<p><span style=\"color: black;\">The list below are the items that the manufacturer will provide for 1 contact stabilization unit. The general contractor must supply the plug valves and mud valves.</span></p><p></p><p><span style=\"color: black;\">1 - Supernatant decant assembly w/ swivel pipe</span></p><p><span style=\"color: black;\">SET - 304SS coarse bubble diffusers w/ SS piping</span></p><p><span style=\"color: black;\">3 - 40 HP Universal Blowers</span></p><p><span style=\"color: black;\">1 - Air header w/ SS diffuser drop assemblies</span></p><p><span style=\"color: black;\">SET - 304SS coarse bubble diffusers w/ SS piping</span></p><p><span style=\"color: black;\">1 - Clarifier weir trough w/ SS weir plates</span></p><p><span style=\"color: black;\">1 - Stilling well, Torque Tube, Sludge Pump</span></p><p><span style=\"color: black;\">1 - Loading pipe (H.D.G)</span></p><p><span style=\"color: black;\">1 - Sludge return assembly, w/ complete mechanical s</span>kimmer<span style=\"color: black;\"> arm (H.D.G.)</span></p><p><span style=\"color: black;\">1 - </span>C<span style=\"color: black;\">omplete mechanical raking arm (H.D.G.)</span></p><p><span style=\"color: black;\">1 - Clarifier mechanical drive unit – Bonfliglioloi</span></p><p>1 - Clarifier Drive Control Panel</p><p>4 -14” Knife Gates</p><p><span style=\"color: black;\">1 - Non-skid galvanized walkway grating and access stairway</span></p><p><span style=\"color: black;\">1 - 1 ½” Walkway / stairway handrail assembly</span></p><p>1 - Installation</p>""4c9593fc-c2d9-487d-a364-c126ded1c915""2026-10-07T18:13:00.808Z"true"<p>The list below are the items that the manufacturer will provide for 1 contact stabilization unit. The general contractor must supply the plug valves and mud valves.</p><p></p><p>1 - Supernatant decant assembly w/ swivel pipe</p><p>SET - 304SS coarse bubble diffusers w/ SS piping</p><p>3 - 40 HP Universal Blowers</p><p>1 - Air header w/ SS diffuser drop assemblies</p><p>SET - 304SS coarse bubble diffusers w/ SS piping</p><p>1 - Clarifier weir trough w/ SS weir plates</p><p>1 - Stilling well, Torque Tube, Sludge Pump</p><p>1 - Loading pipe (H.D.G)</p><p>1 - Sludge return assembly, w/ complete mechanical skimmer arm (H.D.G.)</p><p>1 - Complete mechanical raking arm (H.D.G.)</p><p>1 - Clarifier mechanical drive unit – Bonfliglioloi</p><p>1 - Clarifier Drive Control Panel</p><p>4 - 14” Shear Gates</p><p>4 - 6” Shear Gates</p><p>1 - Non-skid galvanized walkway grating and access stairway</p><p>1 - 1 ½” Walkway / stairway handrail assembly</p><p>1 - Installation</p><p></p><p>If the project awards both contact stabilization units, the manufacturer will provide the list mentioned above for both units (minus the blowers). </p>""826717ea-eb33-4336-8afa-f4e888fde9c5""2026-10-07T18:19:37.542Z"false"<p>The submersible pumps are not required to be explosion proof. </p>""529d54e2-020f-4d6f-bef8-a8b196c64790""2026-10-07T14:21:53.978Z"falseMost Texas work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: CivCast (project 6aa80376961fe3798ed24a11), retrieved via CivCast, the bid board Texas civil engineers advertise on. View the official posting, and always confirm requirements and deadlines with the issuing agency.