This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 03-July 7, 2026
Soliciation amendment attached as document: Solicitation-FA8137326R0033-amendment
New due date for proposals will be provided when the new information is recieved and provided to all contractors.
Reach out to SrA Dorothy Inoa:** dorothy.inoa@us.af.mil** and CC** Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil** with any questions.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 02- June 24, 2026
RFI's and their responses have been posted in the attached document labeled:** RFI Questions 6-24-2026**
Proposal Response Date:** 08 July 2026 at 2PM CST.**
Send proposals to SrA Dorothy Inoa:** dorothy.inoa@us.af.mil** and CC** Sharla Flowers Brandon: sharla.flowers_brandon.1@us.af.mil**
This posting is for Tinker AFB - MAC BOA Holders ONLY.
UPDATE 01 - May 28, 2026
Site Visit was held and concluded on May 28, 2026.
RFIs are due on Thursday June 04, 2026 COB. All RFIs will be sent to CE on Friday June 05, 2026.
Sign in sheet has been added to the attachments.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
After review of the project specific documents, if you are a Tinker AFB – MAC BOA Holder, please send an email to the Contracting Points of Contact as an RSVP stating you are interested in attending the Initial Site Visit.
Your RSVP email must be received within 5 calendar days from the posting of this project. In your RSVP, please let us know if all personnel that will be attending the Initial Site Visit have base access. If anyone requires base access, you must forward with your RSVP the Entry Access List (EAL) so that we can know how many personnel require base access. ****** ONLY MAC BOA Prime Contractors are to RSVP, Subcontractors are to inform at least one Prime Contractor of their intention to attend and if a Subcontractor requires base access, they must be sponsored by a Prime Contractor.*
After receipt of your RSVP by May 21, 2026 COB CST and EAL if required, an Initial Site Visit is set for May 28, 2026 –– B3001.** RSVP required for TIME of the inital site visit. A calendar invite will be sent out to those who RSVP.**
You must attend the Initial Site Visit for the project to be considered eligible to propose.
This posting is for Tinker AFB - MAC BOA Holders ONLY.
The contractor shall furnish all design/engineering services, materials, labor, plant, tools, transportation, equipment, testing services, quality control and incidentals required to accomplish the repair due to a previous flood in the space. The project encompasses a complete interior renovation of the existing 2nd floor space, including architectural, structural, mechanical, electrical, and fire protection work. The contractor is responsible for providing 100% design, including intermediate (65%), pre-final (95%), and final (100%) design submittals, and for performing a site investigation to verify existing conditions. The work includes demolition, new construction, and the installation of new light fixtures, HVAC modifications, fire alarm and sprinkler systems, and finishes. The contractor must also provide record drawings in AutoCAD format.
"73145-9125""TINKER AFB""OK""USA""CP 405 739 4040""7858 5TH ST STE 1""Solicitation - FA813726R0033-amendment.pdf"772308"file"".pdf""1""2026-07-08T14:57:01.798+00:00""34719d80ec33410e86032f2388d0cb47""public""0""public""ad12d0238ef24cc2ad086ed8571c0d74""0"10"0""RFI Questions 6-24-206.pdf"260402"file"".pdf""1""2026-06-24T18:12:44.707+00:00""16e81b9a029945cbbc18d9b41b1127c6""public""0""public""67355f0df97b4cfc8cdd4681e6e03bec""0"9"0""Sign In 05-28-2026.pdf"129495"file"".pdf""1""2026-05-28T19:16:45.167+00:00""69252c18e16c4969b5cf4dbd9fab7082""public""0""public""27562f5fe56c4dd1b6ea7ba1af2d49b5""0"8"0""Solicitation - FA813726R0033.pdf"637083"file"".pdf""1""2026-05-14T19:38:23.137+00:00""fb66dd970f30419ca3e1baf471cd8dac""public""0""public""8cbc3417e9274658924874d31dbc4b87""0"7"0""ATT12_Submittal Register.pdf"164059"file"".pdf""1""2026-05-14T19:38:23.137+00:00""f2765fb97aeb44e8937fa3e8fadb70cc""public""0""public""60fd2e7bfc3e4202b0ccfe698b66fa6e""0"6"0""Wage Determination 5-8-26.pdf"2282296"file"".pdf""1""2026-05-14T19:38:23.137+00:00""4494714aef1f41a8a0b35d1f841533bf""public""0""public""bf1898becc7e459da5e9717f51bc6fd9""0"4"0""ATT10_STATEMENT OF WORKr1.pdf"299903"file"".pdf""1""2026-05-14T19:38:23.137+00:00""086ddba2c9b0420d9df24ec0de0075fe""public""0""public""7dc918bbd210431a845a05421ff3c4c5""0"3"0""ATT11_260007_Design Narrative.pdf"5085825"file"".pdf""1""2026-05-14T19:38:23.137+00:00""7b01a6934c7e4e6a9520460bc18df4c3""public""0""public""8c4414d4ff4442e8af81934edb44b428""0"2"0""ATT13_260007_Drawings.pdf"1829271"file"".pdf""1""2026-05-14T19:38:23.137+00:00""2a826813922f44d58b89517075fa6cbc""public""0""public""805fb193f883427699d377f3d2389061""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.