The purpose of this amendment is to answer questions submitted by perspective offerors:
Question 1: Please confirm total number of GC site personnel that will be required to fulfill the roles of GC Superintendent, SSHO, and QC officer.
Answer - At least 2. SSHO is stand-alone position.
Question 2: Please confirm location of Contractors Job Trailer, Dumpster, and Lay down area on a campus map.
Answer - Please refer to Sheet AE100 for Dumpster / Laydown Area. Job trailer is not required. If contractor requires it, will work with them to site. Dumpster/laydown area as shown.
Question 3: Please confirm how long the overall time obtaining a badge should take as described in spec section 01 00 00 from the time the initial paperwork is submitted until the time the badge is in the employee s hands.
Answer - This will depend on how busy the VA Staff is. Access to the area is only available when warehouse staff are present. ID badge not required. Daily check-in with ECC office in building 100 is required.
Question 4: Will the Furniture / Racks / Supplies / Materials be removed by the Government ahead of construction starting?
Answer - Yes
End of page
The base bid includes general construction, finishes, alterations, HVAC, electrical, necessary removal of existing structures and construction, and certain other items. Alternate No. 1 includes all demolition and construction alterations specifically related to four additional enclosed offices (RCC108R, RCC109R, RCC110R, RCC111R), including related demolition, preparation, walls, doors, frames, hardware, ceilings, finishes, ceiling framing, HVAC, electrical, and fire protection.
"US""30904""AUGUSTA""GA""USA""ONE FREEDOM WAY""36C24726Q0685 0002.docx"17924"file"".docx""1""2026-08-06T17:25:05.951+00:00""85f4ba0f90a94b3899cb42cd9aa486a3""public""0""public""1b7321ec51d14511b817caf929fe1e35""0"15"0""36C24726Q0685 0001.docx"17746"file"".docx""1""2026-08-04T17:27:45.263+00:00""7be537e45d194371885cc0b4b7d01bc0""public""0""public""88c8499a08b54194bfde1a1d5bcbd67f""0"14"0""20251104 - BLDG 7 - 100Pct Sealed - Specifications - Combined.pdf"9733966"file"".pdf""1""2026-07-16T19:44:04.944+00:00""280dce70968647df80f67681d1c2c31d""public""0""public""61bd57e07abb445799cbddc5366076e9""0"13"0""Davis Bacon General Decision Number SC20260004.pdf"6404936"file"".pdf""1""2026-07-16T19:44:04.944+00:00""0245a918ec444980802732185d4ce451""public""0""public""c740d0013c44416f81e20ad0ec3fe540""0"12"0""20251104 - BLDG 7 - 100Pct Sealed - COMBINED DRAWINGS.pdf"5330309"file"".pdf""1""2026-07-16T19:44:04.944+00:00""5e6449c58dca4043b081748e1a2433ea""public""0""public""b1f8ace3e90a40a6bc06cc255dbaec59""0"11"0""Attachment X PPQ .docx"106781"file"".docx""1""2026-07-16T19:36:24.121+00:00""91e22c3501ba40d8817ed372468bfbef""public""0""public""f2f497b393f54d6d8d34e60b46d877c3""0"10"0""Attachment VIIII - EMR.docx"15101"file"".docx""1""2026-07-16T19:36:24.121+00:00""218151ae4f88431599a6cb26b4f9e6d9""public""0""public""fe693060e3a64a328dfba57a0e43286e""0"9"0""Attachment VIII - Compliance with Executive order 13899.pdf"114869"file"".pdf""1""2026-07-16T19:36:24.121+00:00""a8ce50ec9fed4dfc94e3495b4c58dab4""public""0""public""708900ab4db84f509794ef6e2533d526""0"8"0""Attachment VII - Class Deviation from the Federal Acquisition Regulation.pdf"461291"file"".pdf""1""2026-07-16T19:36:24.121+00:00""d6d40d08f4eb4ac08ed8641214207ab8""public""0""public""e3c50e7c3996496cb21c7d05f24a7af7""0"7"0""Attachment VI - SF24-23a Bid Bond.pdf"720305"file"".pdf""1""2026-07-16T19:36:24.121+00:00""4d4d3cfab85f41e1ae767c2405cb62ab""public""0""public""59841fdcac474c219049b2309589e7c0""0"6"0""Attachment V - 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING.pdf"142964"file"".pdf""1""2026-07-16T19:36:24.121+00:00""c13ab76a23ae43c2a19dd6f581cbfc8b""public""0""public""e19f2844e8d749aca14c594f06ab0137""0"5"0""Attachment IV COMBINED DRAWINGS.pdf"5330309"file"".pdf""1""2026-07-16T19:36:24.121+00:00""2f328d9354b64ddeba377a195d915f3c""public""0""public""d7a9bb4bebce4c7ba592d0eb5f926126""0"4"0""Attachment III Specifications Combined.pdf"9733966"file"".pdf""1""2026-07-16T19:36:24.121+00:00""a84f36593dcb4489916953e97c07370a""public""0""public""c574e27b057c4becbf241cb7fda0b8b2""0"3"0""Attachment I - Davis Bacon General Decision Number SC20260004.pdf"6404936"file"".pdf""1""2026-07-16T19:36:24.121+00:00""5810f14bdcd942ebb78fbce112dcc470""public""0""public""9ae5b38c17b441d685770733fe0e6d69""0"2"0""36C24726Q0685.docx"99175"file"".docx""1""2026-07-16T19:36:24.121+00:00""b5cdcaf656fa47288a6fa47fe678170b""public""0""public""043c9a8739744b31b5774cf96984ba16""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.