We post new insulation opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The Contractor shall provide all labor, equipment, and materials to replace the waterproofi ng system per the attached contract documents (Herbert C. Hoover Building, Courtyard 2 Water Infiltration Resolution). This includes but is not limited to topping slab, drainage boards, drains, plumbing, flashing, control joints, expansion joints, granite pavement and granite base course. Repair all cracks and spalls in the structural slab prior to installation of new fully adhered waterproofing membrane. The waterproofing system must be adequately transitioned into adjacent waterproofing and building components.
This solicitation is only open to IDIQ holders of the GSA East Coast Corridor IDIQ.
The Contractor shall provide all labor, equipment, and materials to replace the waterproofing system per the attached contract documents (Herbert C. Hoover Building, Courtyard 2 Water Infiltration Resolution). This includes but is not limited to topping slab, drainage boards, drains, plumbing, flashing, control joints, expansion joints, granite pavement and granite base course. Repair all cracks and spalls in the structural slab prior to installation of new fully adhered waterproofing membrane. The waterproofing system must be adequately transitioned into adjacent waterproofing and building components.
"47PE5326E0057 HBB Water Infiltration Solicitation 20260727.zip"115626658"file"".zip""1""2026-07-27T19:44:17.838+00:00""e0d86a7b933340898c0c6ae8be70d7c5""private""0""controlled""aeed6696b62443578fd8187426759aba""1"1"0"Source: SAM.gov (notice 78ad5e6d39ef4df08f11f3d6832981c4), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.