We post new hvac opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Amendment 0001 is issued to provide the Government's responses to questions received regarding the solicitation and to incorporate revisions to the applicable solicitation documents.
Offerors are to review Amendment 0001 and all revised attachments/documents in their entirety and acknowledge receipt of the amendment in accordance with the solicitation instructions.
The proposal due date is extended. Proposal Due Date: August 20, 2026, at 12:00 PM Eastern Time (ET)
The Mandatory Site Visit Attendee List is posted. Please refer to "75F40126R00049 Site Visit Attendee List 260722".
The U.S. Food and Drug Administration (FDA), Office of Acquisitions and Grants Services (OAGS), is issuing Solicitation 75F40126R00049 for the IRV Lab Exhaust & Vacuum Pump Replacement Project at the FDA Pacific Southwest Laboratory, 19701 Fairchild Road, Irvine, California.
This is a full and open competition.
The contractor shall provide all labor, materials, equipment, supervision, permits, testing, commissioning, and related services needed to remove and replace the laboratory vacuum pump system and install a new laboratory exhaust system. The work also includes Building Automation System (BAS) integration, testing and balancing (TAB), commissioning, training, and project closeout, as described in the solicitation and Scope of Work.
Mandatory Site Visit: A mandatory site visit will be held on:
Date: Wednesday, July 22, 2026
Time: 8:30 a.m. Pacific Time
Location: FDA Pacific Southwest Laboratory, 19701 Fairchild Road, Irvine, CA 92612
To attend, offerors must register by 12:00 p.m. Pacific Time on Monday, July 20, 2026 by emailing the Contracting Officer and Contract Specialist listed in the solicitation. Include the names of all attendees when registering. Each company may send up to three (3) representatives. All attendees must present a valid government-issued photo ID and comply with FDA security requirements. Attendance at the site visit is required. The Government will not consider proposals from offerors that do not attend the mandatory site visit. No exceptions.
Submit questions and proposals by the deadlines shown in the solicitation. The solicitation, attachments, and any amendments are available through this SAM.gov notice.
Offerors must have an active registration in SAM.gov when they submit a proposal, during the evaluation period, and before contract award.
The contractor shall provide all labor, materials, equipment, supervision, permits, testing, commissioning, and related services needed to remove and replace the laboratory vacuum pump system and install a new laboratory exhaust system. The work also includes Building Automation System (BAS) integration, testing and balancing (TAB), commissioning, training, and project closeout, as described in the solicitation and Scope of Work.
"20201""Washington""DC""US""Hubert H. Humphrey Building 200 Independence Avenue, SW ""20841""Rockville""MD""US"" 5630 Fishers Lane ""20857""ROCKVILLE""MD""USA""5630 FISHERS LANE""HFA-500""75F40126R00049_IRV Exhaust_Vacuum Pump_Amend 01.pdf"87201"file"".pdf""1""2026-08-04T13:32:59.896+00:00""c7e4dc7cec634cc7a8b497448d008ad9""public""0""public""a2e052de70b247d0ac3cc3a8495220c4""0"37"0""75F40126R00049_RFP_IRV Exhaust_Vacuum Pump_clean_08032026.pdf"530340"file"".pdf""1""2026-08-04T13:32:59.896+00:00""410f2539397946518ded5d55c97aae26""public""0""public""4494e665eb4b487e99458b5d58ad802d""0"36"0""75F40126R00049_RFP_IRV Exhaust_Vacuum Pump_redline_08032026.pdf"472176"file"".pdf""1""2026-08-04T13:32:59.896+00:00""faeb35b3cf1443f991316b1d25a21cad""public""0""public""440a0752b5674dbc8b9da12a4add998b""0"35"0""Attach_5_WD_CA20260024_07142026.pdf"155679"file"".pdf""1""2026-08-04T13:32:59.896+00:00""c969663580f644348b200bd24ac617a3""public""0""public""1a82344cbcfb43dc8e7b349aad6cae77""0"34"0""Attach_8_IRV Exhaust_Pump_QA_Master.xlsx"19211"file"".xlsx""1""2026-08-04T13:32:59.896+00:00""12987efbc34b448eaaf6d1eacf3c84ab""public""0""public""72c0d14f58e7442ebc5f85716ec22758""0"33"0""Attach_9_HVAC_Plumbling_Arch Plans.zip"6683552"file"".zip""1""2026-08-04T13:32:59.896+00:00""89fc3d2a57424c5da634ec15dad78d2f""public""0""public""a6ee6d14bc474b1c8dd163ebd3d15990""0"32"0""75F40126R00049 Site Visit Attendee List 260722.pdf"135112"file"".pdf""1""2026-07-22T19:10:25.018+00:00""61cfdcfd5ea14c86a86949fb0dd43a0c""public""0""public""ae6fb48ace4941858141e795758adcf6""0"22"0""75F40126R00049_RFP_IRV Exhaust_Vacuum Pump.pdf"820334"file"".pdf""1""2026-07-07T14:19:08.02+00:00""3a1496c61fe44fb3b707110deb0644d2""public""0""public""a9887df5bae047ddb623e5043d09c684""0"21"0""Attach_1_IRV Exhaust_Vacuum Pump_SOW.pdf"432040"file"".pdf""1""2026-07-07T14:19:08.02+00:00""abc01de92013418c8bea6c8eeabff16b""public""0""public""bcc73d79f0de4c8e837d424d02c44ef8""0"20"0""Attach_2_IRV Rm2309 Exhaust Specs.pdf"4022076"file"".pdf""1""2026-07-07T14:19:08.02+00:00""c352987361664f73b896a1f430f15521""public""0""public""b6908b9a0d444f0ea0e6af49ccba728d""0"19"0""Attach_3_IRV Rm2309 Exhaust Design.pdf"3900888"file"".pdf""1""2026-07-07T14:19:08.02+00:00""c8fda15e781643a6a9ce3d92ab882a5e""public""0""public""2894bf067a304d8a9844c48fcb70624d""0"16"0""Attach_4_IRV_Exhaust_Vacuum_Pricing Schedule.xlsx"30904"file"".xlsx""1""2026-07-07T14:19:08.02+00:00""19c367eff3254c9db8770b995cf8b753""public""0""public""4238d755df1646018eb4c9f80a37272f""0"11"0""Attach_5_WD_CA20260024_05182026.pdf"228099"file"".pdf""1""2026-07-07T14:19:08.02+00:00""bec9936fe6534dffbc827fe6ed7f27fc""public""0""public""f8ad7320fc3342f79d2a28714e5b9d6b""0"9"0""Attach_6_FDA CTR Security Clearance.pdf"469526"file"".pdf""1""2026-07-07T14:19:08.02+00:00""ee7262d391084611a87d6cbb7b4b08c9""public""0""public""3dd6b8f0857d4fed8d8aa46898e00999""0"8"0""Attach_7_Past Performance Questionnaire.pdf"467740"file"".pdf""1""2026-07-07T14:19:08.02+00:00""5046bb6716434d8b983aba929c666961""public""0""public""0e7b742080b54f30bd1eb9d60a804cc9""0"7"0""Attach_8_IRV Exhaust_Pump_QA_Template.xlsx"22131"file"".xlsx""1""2026-07-07T14:19:08.02+00:00""81822556d6f042ba9c087c2c304a15ec""public""0""public""2006d9060eb24203b68dab240fd87381""0"2"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 68330137165745819a143d1484b6fa83), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.