NAVFAC Solicitation No. : N4008526R0219, Design Bid Build - Decentralize Steam - Provide Natural Gas Fired Boilers at Buildings 23A, 43, 44, 49 at Naval Health Care New England (NHCNE) Newport, RI
THIS ACTION IS RESERVED FOR DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT
**N40085-21-D-0052 **Benaka Inc.
**N40085-21-D-0053 **CCI Utility and Construction Services, LLC
**N40085-21-D-0054 **Kunj Construction Corporation
**N40085-21-D-0055 **Ocean Construction Services
**N40085-21-D-0056 **PEM-Harkins Joint Venture
**N40085-21-D-0057 **Tantara Corporation
**N40085-21-D-0066 **J&J Contractors, Inc.
DESCRIPTION OF WORK:
The work includes removal of (4) facilities from the building A6 steam supply system. The (4) buildings being taken off of steam service (23A, 43, 44, and 49) shall have their steam to heating hotwater exchangers removed and natural gas boilers provided in their place. Building B23A shall also have its domestic hot water heaters replaced.
Work includes the trenching and backfilling for the installation of gas piping to each of four buildings, restoration of paving due to gas piping installation, The contractor shall be responsible for connecting to the utility meter and provide gas distribution to the installed boilers.
This amendment 0001 incorporates the following :
(1) A6 Decentralization_DRAWINGS_Rev-20260805.pdf
(2) A6 Decentralization Submittal Register.pdf
(3) Basis of Design for reference only.pdf
(4) Final Soil Management Plan Effective February 4, 2026 Signed.pdf
(5) ICRA Requirements.pdf
(6) NHCNE Decentralize Steam - PPI_Final_Responses
(7) Site Visit Sign in sheet
(8) Proposal Due date extended to 26 AUGUST 2026 02:00 PM
This amendment 0002 incorporates the following :
The work includes removal of (4) facilities from the building A6 steam supply system. The (4) buildings being taken off of steam service (23A, 43, 44, and 49) shall have their steam to heating hotwater exchangers removed and natural gas boilers provided in their place. Building B23A shall also have its domestic hot water heaters replaced. Work includes the trenching and backfilling for the installation of gas piping to each of four buildings, restoration of paving due to gas piping installation, The contractor shall be responsible for connecting to the utility meter and provide gas distribution to the installed boilers. The construction contractor shall provide all site work (excavation, trench preparation, backfill, paving, site restoration, etc.) and Rhode Island Energy (RIE) will provide the gas line/piping installation up to and including the gas meters in the prepared trenches under a separate contract with the Navy. The construction contractor shall be responsible for providing all natural gas piping and appurtenances from the exterior meter through the exterior wall into the building up to the boilers. Controls for each facility shall tie into the existing BACnet through the existing Johnson Controls MetaSYS controllers. Work also includes pouring concrete housekeeping pads for new equipment along with removal of some interior building trenches no longer needed, filling them in and pouring a new concrete slab, filling holes in foundations where pipes are removed with concrete, and reinforcing penetrations through roofs for piping and making flashing and roofing repairs.
"23511-0395""NORFOLK""VA""USA""9324 VIRGINIA AVENUE""NHCNE Decentralize Steam - PPI_Final_Responses R1.xlsx"27096"file"".xlsx""1""2026-08-11T10:56:17.379+00:00""f797173b893e4192bd2741b1aee7a28d""public""0""public""cb347ed8b7b5458d81a7c2c3bcc70a20""0"17"0""Final Soil Management Plan Effective February 4 2026 Signed.pdf"602383"file"".pdf""1""2026-08-10T20:08:41.776+00:00""fdfaaaf723cc41338c822955291230dd""public""0""public""edce1a6ef7534421a5c133e182b5db37""0"16"0""A6 Decentralization_DRAWINGS_Rev-20260805.pdf"14573501"file"".pdf""1""2026-08-10T20:08:41.776+00:00""6510937a9a544c478d19d13112de3617""public""0""public""12f8e5949178457d975bf053497fe143""0"15"0""ICRA Requirements.pdf"584783"file"".pdf""1""2026-08-10T20:08:41.776+00:00""adee9bb5f87f434397025da9d005a235""public""0""public""d1c0d9caacc943c5bc34d9f35bd1abfe""0"14"0""A6 Decentralization Submittal Register.pdf"296110"file"".pdf""1""2026-08-10T20:08:41.776+00:00""b30e8acddfb042e6a5c454de9cf5c8ef""public""0""public""fb09387a0a974e0da51928b59b977024""0"13"0""Basis of Design_for reference only.pdf"161723"file"".pdf""1""2026-08-10T20:08:41.776+00:00""63cf3e2bba934125a575af9e613869cc""public""0""public""0d6cf37603594e0895534ae290151148""0"12"0""NHCNE Decentralize Steam - PPI_Final_Responses.xlsx"27056"file"".xlsx""1""2026-08-10T20:08:41.776+00:00""0979130f5d9546f0ade08085dd46d995""public""0""public""4c080666d610428ca0bea21230919e83""0"11"0""Decental Steam site visit.pdf"32129"file"".pdf""1""2026-08-10T20:08:41.776+00:00""4a19064702574f74b66e5f7a42d00cc7""public""0""public""28f7be335e024c8b93798d80695a929d""0"11"0""Attachment C - Decentralization_DRAWINGS.pdf"14966689"file"".pdf""1""2026-07-07T13:41:23.809+00:00""2a12638031cb412a878d2551a483060d""public""0""public""e4e878efd1cd4ccf8a14416efec8dd7c""0"10"0""Attachment E - Wage Determination RI20260001.pdf"5720048"file"".pdf""1""2026-07-07T13:41:23.809+00:00""db55081bda2546768b5194faf6a5bbef""public""0""public""55d378ec95194790850856e49a0c1e8f""0"9"0""Attachment B - Decentralization_SPECIFICATION.pdf"2837536"file"".pdf""1""2026-07-07T13:41:23.809+00:00""4d6e08ed63c4480593c48627c7156a8d""public""0""public""b6a620bb31bc4e5d9787f04070ce5efa""0"8"0""Attachment I - SECNAV 5512 FORM.pdf"1318331"file"".pdf""1""2026-07-07T13:41:23.809+00:00""171c0c2f53b44045a445ee88a4cc163e""public""0""public""d3ecb8a6a7114e38acbbde02269f2efa""0"7"0""Attachment G - PIEE Vendor Access Instructions.pdf"521498"file"".pdf""1""2026-07-07T13:41:23.809+00:00""ad9f88f8929d488db18133af94d87190""public""0""public""368a8ede9b4c4033806454f5e33fd24c""0"6"0""Attachment A - 26R0219 - Steam Decentralization General Requirements.pdf"347805"file"".pdf""1""2026-07-07T13:41:23.809+00:00""21c680df4f0342838d408b6d0f871a0b""public""0""public""9ea22a1e374b439ca9f695084a970b24""0"5"0""Attachment J - SITE VISIT MAP.pdf"269662"file"".pdf""1""2026-07-07T13:41:23.809+00:00""eaf3cfe2a3df4ec3a6f547825fd7f667""public""0""public""eb8fad186a724479b28f011130c8a38c""0"4"0""Attachment D - Bid Schedule.pdf"122001"file"".pdf""1""2026-07-07T13:41:23.809+00:00""83e2cd36ecad4507b22f293a8bee1822""public""0""public""c2408043d08648ebbf37c1e209299232""0"3"0""Attachment H - NSN NHCNE SITE VISIT PROCEDURES.docx"36079"file"".docx""1""2026-07-07T13:41:23.809+00:00""cf5747ca64194d35976712f938e34272""public""0""public""bb26443af1994420b96cdb9e676c3f6e""0"2"0""Attachment F - Pre-Proposal Inquiry (PPI) form.xlsx"11670"file"".xlsx""1""2026-07-07T13:41:23.809+00:00""ee0fa495fb5949a7a6d695c5bd78e206""public""0""public""3a4d95e45b04402d9b6d5ecd8aa98db1""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice 57f9cf46625c4e0a94a735a20df5e78e), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.