We post new hazard abatement opportunities in New Mexico as agencies publish them. Get them in one email — free, and unsubscribe whenever.
PECO-INSTALL RADON MITIGATION CASITA
Amendment 1 extends the Quote Reply Due Date for time to respond to Q&A
The contractor must furnish all labor, materials, and equipment to modify the existing radon mitigation system or install new systems at the two-unit Casita at Pecos National Historical Park. Work includes conducting a site survey, baseline radon testing, pressure field extension communication testing, submitting a design proposal considering the historic nature of the building, and performing horizontal boring and external mitigation on the north side if needed. The contractor must also provide radon testing results at 15 days, 30 days, and six months to prove the system is working.
"US""82190""YELWSTN NL PK""WY""USA""PO BOX 168, MAMMOTH SUPPLY BLDG #34""Sol_140P1226Q0041_Amd_0001.pdf"208273"file"".pdf""1""2026-08-07T18:57:27.795+00:00""6afe5514251c41029ac1e59773e7b897""public""0""public""6cfaad54d42a4abe87b655c2eab9a2de""0"4"0""Sol_140P1226Q0041.pdf"583462"file"".pdf""1""2026-07-30T21:11:21.122+00:00""44d551927c734f2f8aa39c7957d4a159""public""0""public""7d41b04571eb4490aff7842468fadc76""0"3"0""B08_Attachment_1_SOW_Statement_of_Work.pdf"957714"file"".pdf""1""2026-07-30T21:11:21.122+00:00""96153a8c92a24c3eb593ab555f0ce04c""public""0""public""c41139909902414d855a744fc8e8b077""0"2"0""B08_Attachment_2_Wage_Determination_per_DBA_TX20260173.pdf"202793"file"".pdf""1""2026-07-30T21:11:21.122+00:00""4ae176ff00c347c487d6308ee82a6172""public""0""public""4d6b3f2ac46f41b6b5d186a138a46526""0"1"0"Source: SAM.gov (notice 2ad9708937ee46ce9b42865177769071), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.