We post new hvac opportunities in Washington, DC as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Construction project for the Main Treasury to Remove and install the CRAC units in Vault 9 and remove, modify and install two new doors in Vault 9 as outlined in: a) MT Vault 9 M&E drawings dated 3-19-26 and b) MT Vault 9 Installation of New Doors dated 6-6-26.
The contractor shall provide all labor, tools, equipment, management, supplies and any other items deemed necessary to complete the following: Remove and install the CRAC units in Vault 9 and remove, modify and install two new doors in Vault 9 as outlined in MT Vault 9 M&E drawings dated 3-19-26 and MT Vault 9 Installation of New Doors dated 6-6-26. Mechanical Phase 1 includes removing existing doors, enlarging wall openings, installing 44-inch doors with STC-50 rating, removing existing CRAC 9-1, installing new Liebert unit with floor stands, piping, ductwork, and balancing. Mechanical Phase 2 includes removing existing CRAC 9-1A, installing new unit, piping, ductwork, and balancing. Electrical scope includes providing circuits, raceways, wire, devices, demolishing existing power, and installing new conduit, wiring, breakers, and disconnects. Siemens Controls scope includes demo and controls for CRAC units with BACnet interface and integration into BAS system.
"US""20706""NEW CARROLLTON""MD""USA""5000 ELLIN ROAD""MT Vault-9 ME drawings dated 3-19-2026.pdf"2709130"file"".pdf""1""2026-07-31T13:51:53.628+00:00""72da5a03b4914e85986299b455d82339""public""0""public""185550da11494aaca45d7fa91ffb4cde""0"8"0""WD.pdf"43927"file"".pdf""1""2026-07-31T13:51:53.628+00:00""f6690df5bc2f479d9009da7fc65c3d48""public""0""public""216e988db7e64677bf4d6c627f6c3590""0"7"0""Schedule 26PRSSP0238.docx"156036"file"".docx""1""2026-07-31T13:51:53.628+00:00""0b3b7ff2905e4b7284c3c53b3d195f75""public""0""public""eaf1ae627e0a4e42b61eac282f02a87b""0"6"0""MT Vault 9 Installation of New Doors dated 6-6-26 (1).pdf"27237840"file"".pdf""1""2026-07-31T13:51:53.628+00:00""23989c23271d4eefb13509f90be52dea""public""0""public""d2b9e1b66f304b2b9c68b33a49b472ad""0"5"0""Corporate Experience Worksheet.docx"14821"file"".docx""1""2026-07-31T13:51:53.628+00:00""bc87d66c26f74b6aa05fe491cdf696c9""public""0""public""9842ee7159b845eb849f0426e5f1bb1f""0"4"0""APU No. 26-01 - Attachment 2 - Fillable.pdf"207558"file"".pdf""1""2026-07-31T13:51:53.628+00:00""960f4ec2b5914e2d907b8d99afa45003""public""0""public""20963edf3c404b91b69a5f54478f9e69""0"3"0""APU No. 26-01 - Attachment 1 - Fillable.pdf"273189"file"".pdf""1""2026-07-31T13:51:53.628+00:00""f3cb78c4c4de4176805c6dbea76a3046""public""0""public""2070c370b8f74a299f3d54070f67d4af""0"2"0""2032H326R00017.pdf"110480"file"".pdf""1""2026-07-31T13:51:53.628+00:00""e5a38c1ec7784245893a33753d8c660b""public""0""public""5d33784149f04652bde41241fc6b3f94""0"1"0"Source: SAM.gov (notice 1fa96449951544deba4d964cf8fc18d1), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.