We post new excavating opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
See the attached for detailed project descriptions and requirements.
The contractor will perform geotechnical drilling including HSA Drilling (estimated 90 linear feet), HQ3 Core Drilling (estimated 20 linear feet), SPT Sample Collection (estimated 16 each), mobilization/demobilization, stand-by rate due to weather, daily mobilization (lodging to project site), per diem based on CONUS, miscellaneous expenses (five 5-gallon buckets with lids and four core boxes), water truck or trailer with appropriate capacity and pump, and traffic control (signs and cones to define work area).
"US""US""80228""LAKEWOOD""CO""USA""12300 W. DAKOTA AVE""6982AF26Q000017 UT FLAP GAR BURR 1 Bullfrog Creek Bridge.pdf"6743581"file"".pdf""1""2026-07-27T16:34:49.588+00:00""f6eabbb954aa47bf903a2e72abbd4e1c""public""0""public""fcc475cbb3f543f8a0ef7c8ab42e5b77""0"1"0"Source: SAM.gov (notice 088078b5c7ce4777a58016d9646778f5), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.