We post new asphalt opportunities in Washington as agencies publish them. Get them in one email — free, and unsubscribe whenever.
PROJECT: WA ERFO FS GIFPN603 2022-1(1), Gifford Pinchot ERFO Repairs 2022
LOCATION: 14 miles SE of Randle, WA
WORK: excavation, grading, aggregate and roadway reconditioning, drainage, and permanent traffic control. See “Project Description” posted under Attachments for additional details.
PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis.
LENGTH: 0.75 miles
TENTATIVE COMPLETION DATE: Fall 2028
CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $700,000 and $2,000,000.
This project is anticipated to be solicited Winter 2026/2027.
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp.
To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page. When solicitation documents are issued, the INVITATION FOR BIDS (specifications and plans) will be posted at this link.
The work consists of repairing 0.38 mile of the NF-2801 road and realigning 0.37 mile of NF-2801 road. This includes excavation, grading, aggregate roadway reconditioning, aggregate roadway surfacing, roadway obliteration, drainage and permanent traffic control. Quantities include 7,000 CUYD of excavation, 1,800 CUYD of minor crushed aggregate, 2,000 SQYD of road reconditioning, 8,110 LNFT of fiber roll, 22 EA of check dam, 35 LNFT of 18-inch pipe culvert, 190 LNFT of 24-inch pipe culvert, 10 EA of end section, 1 EA of inlet FLH TYPE 7A, 1 EA of spillway assembly, 3 EA of pipe anchor assembly, 9,920 SQYD of topsoil at 4-inch depth, 14,000 SQYD of mulching, 5 EA of sign system, 6 EA of barricade type 3, and 168 SQFT of construction sign.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""PROJECT DESCRIPTION_WA ERFO FS GIFPN603 2022-1(1).pdf"269802"file"".pdf""1""2026-07-28T21:29:07.597+00:00""3f082258fa4847088ec479d96a1f4f8a""public""0""public""91891e8b3de34bca95b1113729de047c""0"6"0""Prelim Letter_WA ERFO GIFPN603 2022-1(1).pdf"286311"file"".pdf""1""2026-07-28T21:29:07.597+00:00""d06dc8e5032f44fbbcdf87b28f3aa837""public""0""public""866d8fa8656048a2baf03544f13696e0""0"5"0""wa-ef-gifpn2022-1-1_Preliminary PLAN.pdf"9821363"file"".pdf""1""2026-07-28T21:29:07.597+00:00""772398297e11446db178207a4d1f8742""public""0""public""8ea25243d5b546d3b7384e57f97ba7cd""0"4"0"Source: SAM.gov (notice ade2f76c7d9a4ded8855ff399eca5a3b), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.