UPDATE 14 JULY 2026
This opportunity is being suspended while the requirements are underreview pending updated deptarment policy. The updated bid due date of 17 August is a placeholder. Current estimate on updated requirement documents to be published on/around 22 July 2026, along with an updated bid due date. Any quotes recieved up to this point will not be considered for bid.
UPDATE 7 JULY 2026
Removed previous description of requirements and uploaded new version. The new document and 4 attachments can be found in the attachment/links section. MSANG CRTC CCTV Description of Requirements, Attachments A,B,C, and D.
Round 2 of Questions and Answers attached.
Extended bid due date to 1300 CST (1:00 PM) 17 July 2026.
UPDATE 24 JUNE 2026
Offer due has been extended to 9 July 2026 a 2:00 PM CST. This is to provide adequate time to recieve and respond to Q&A's generated from the site visit.
UPDATE 23 JUNE 2026
Site visit conducted. Attendee list added as 20260623_Site Survey attachment.
Questions are due to listed POC's by 26 June 2026 at 1300 CST. Send all questions to the following:
andrew.cates.2@us.af.mil, james.nelson.78@us.af.mil, and michael.hornbeck@us.af.mil.
An updated PWS with an associated map is anticipated to be released shortly after Q&A's are completed.
UPDATE 16 JUNE 2026 RFI1 Questions and Answers Attachemnt
See Attachment 1 – Description of Requirement for full details.
SITE SURVEY WILL BE HELD ON SITE ON 23 JUNE 2026 AT 1000. PLEASE RESPOND VIA EMAIL BY 1200 CST 18 JUNE 2026 IF ATTENDING***
Delivery Address:
4715 Hewes Ave
Gulfport, MS 39507
The contractor must deploy 54 high-definition cameras (44 bullet, 9 PTZ, 1 360-degree dome) with specific mounting and performance requirements, including Pixels-Per-Foot targets per UFC 4-021-02. The system must include a DVR/NVR with RAID 5 storage supporting 54 channels plus 10% expansion overhead, minimum 30-day retention, and frame rate optimization (15 fps at IACPs, 4 fps elsewhere). Three primary control stations and one dedicated munitions monitoring station are required. All equipment must adhere to the Approved Equipment List (Attachment A).