We post new roofing opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
This project consists of the reroofing of the historic UTE Tower on the Ashley National Forest.
B. Work includes:
Remove and dispose of existing cedar wood shingle roofing system.
The existing plywood sheathing to remain.
Remove & reinstall the lightning protection rod, lightning protection cables across the
roof, clamps & fasteners across the roof, and appurtenances across the roof.
Section 073129 SYNTHETIC CEDAR SHINGLES, and as per manufacturer’s
instructions, to include matching synthetic cedar ridge caps on each of the 4 ridges.
underlayment over the entire roof, the flashing, the synthetic shingles, the synthetic
ridge caps, and all necessary fasteners and accessories. Flashing shall be galvanized
steel, no sheen, mill finish.
match existing material and dimensions. Within that new sleeved flashing piece,
reinstall the salvaged stove pipe w/ flashing to match
The work includes removing and disposing of the existing cedar wood shingle roofing system, while leaving the existing plywood sheathing in place. The contractor must remove and reinstall the lightning protection rod, cables, clamps, fasteners, and appurtenances across the roof. A multi-width synthetic cedar shingle roofing system will be installed, including matching synthetic cedar ridge caps on each of the 4 ridges. The work also includes installing roofing felt and self-adhering ice shield underlayment over the entire roof, flashing, synthetic shingles, synthetic ridge caps, and all necessary fasteners and accessories. Flashing shall be galvanized steel with a no sheen, mill finish. Additionally, the contractor must fabricate and install a matching stove pipe sleeved flashing piece to match existing material and dimensions, and reinstall the salvaged stove pipe with flashing within that new sleeved flashing piece.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice e6210851c8214083a1dd82a6bf382559), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.