Amendment 36C25526R0166_1 0003
Purpose: The site-visit sign-in sheet and RFI questions are incorporated. Please see attachement section for sign in sheet and RFIs.
Amendment 36C25526R0166_1 0002
Purpose: The design manual attached also serves as the specifications for this solicitation. The solicitation can be accessed in the attachment section.
Amendment 36C25526R0166_1 0001
Purpose: To include VA Notice of Limitations on Subcontracting Attachment. Please see attachments section.
Please reponsed by the specified date and time for consideration of contrat award. The solicitation is included in the attachments section of this announcement.
The scope of work includes the removal of four existing domestic hot water generators and the installation of four new 45-gallon hot water generators in room B018-01-JC. The work involves pre-installation planning, installation of new generators including connection to existing piping, integration of controls and safety devices, commissioning of new units, transition and removal of old generators, final system checks, and project closeout. The contractor must also provide Guarantee Period Services for one year after completion.
We post new hvac opportunities in Missouri as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"US""66048""LEAVENWORTH""KS""USA""VA MEDICAL CENTER""4101 SOUTH 4TH STREET""PRE-PROPOSAL RFIs 36C25526R0166.pdf"103080"file"".pdf""1""2026-09-28T17:27:13.924+00:00""73ffdb4638e147b6a2459d714761597e""public""0""public""16cac6166ff7453aa8a4f1419e05dd51""0"8"0""PRE-PROPOSAL SITE VISIT SIGN IN SHEET 657-27-107.pdf"93696"file"".pdf""1""2026-09-28T17:27:13.924+00:00""ab464accada643c88bea934ed4ab44f4""public""0""public""64799ad9c8a245d58d09e2d17c278aa9""0"7"0""VAAR 852.219-75 LIMITATIONS ON SUBCONTRACTING.pdf"149385"file"".pdf""1""2026-09-17T20:33:20.101+00:00""59481366b2d74fe7a44c1306b6c332a2""public""0""public""09f5bd2fb44c4b2c87269bec4180e182""0"5"0""ATTACHMENT DESIGN MANUAL 36C25526R0166_1.pdf"1513120"file"".pdf""1""2026-09-16T21:02:10.079+00:00""97aa943eedfa47d1bfeef703b96e803d""public""0""public""1fa52ee9864847bfb45bfa7d373689f9""0"4"0""ATTACHMENT DRAWINGS 36C25526R0166_1.pdf"3615683"file"".pdf""1""2026-09-16T21:02:10.079+00:00""f47b87d3d17143da9f1272b1d0000af3""public""0""public""cd5458efa3ee4a44a08f9de611454527""0"3"0""ATTACHMENT SPECIFICATIONS 36C25526R0166_1.pdf"1513120"file"".pdf""1""2026-09-16T21:02:10.079+00:00""89c680612ebf4934adc93d062c23318d""public""0""public""fbbcb0d9a4c544ce9fd7a7f801cbfc1f""0"2"0""SOLICITATION 36C25526R0166_1.pdf"930147"file"".pdf""1""2026-09-16T21:02:10.079+00:00""b36b458042d84111954859c20f54838e""public""0""public""8813ec7b37da42c3917e62a1bdbaca1a""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d837aaba872245f1b1c40416381763c8), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.