We post new excavating opportunities in Florida as agencies publish them. Get them in one email — free, and unsubscribe whenever.
PROJECT DESCRIPTION: Base project work involves maintenance dredging of the Kings Bay Entrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site (ODMDS)(D/A-O), the Fernandina Nearshore Placement Area (P/A-N), the Fort Clinch Placement Area (P/A-F), and the North Beach Placement Area (P/A-NB). Incidental work includes environmental and water quality monitoring, vibration monitoring, beach fill quality control, beach tilling, and sea turtle and sturgeon trawling, and interim demobilization and mobilization (cutter-suction dredges only).
Option A project work consists of Fort Clinch pre-placement debris removal. Option B work includes beach tilling from FDEP Monument R-019 to R-029. BIDS DUE: 12 August 2026 at 1:00 PM EDT. NAICS CODE: 237990, OTHER HEAVY CIVIL ENGINEERING CONSTRUCTION.
SMALL BUSINESS SIZE STANDARD: $37 million. TARGET PRICE RANGE: Between $20,000,000.00 and $30,000,000.00. PERIOD OF PERFORMANCE: 185 calendar days after receipt of the Notice to Proceed (NTP); the contractor shall commence work within 60 calendar days of receipt of NTP. THIS IS AN UNRESTRICTED PROCUREMENT. SEE ATTACHED SOLICITATION DOCUMENTATION FOR FURTHER DETAILS AND SUBMISSION INSTRUCTIONS
Base project work involves maintenance dredging of the Kings Bay Entrance Channel Cut-1N through Range-E. The excavated material will be distributed among the Fernandina Ocean Dredged Material Disposal Site (ODMDS)(D/A-O), the Fernandina Nearshore Placement Area (P/A-N), the Fort Clinch Placement Area (P/A-F), and the North Beach Placement Area (P/A-NB). Incidental work includes environmental and water quality monitoring, vibration monitoring, beach fill quality control, beach tilling, and sea turtle and sturgeon trawling, and interim demobilization and mobilization (cutter-suction dredges only). Option A project work consists of Fort Clinch pre-placement debris removal. Option B work includes beach tilling from FDEP Monument R-019 to R-029.
"32207-8175""JACKSONVILLE""FL""USA""KO CONTRACTING DIVISION""701 SAN MARCO BLVD""https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?noticeId=W912EP26BA012¬iceType=SolicitationNotice"0"link""1""2026-07-10T13:22:46.304+00:00""0ab2250b99e1413393ba98d6fd2bafc4""public""0""PIEE Solicitation Module Link for W912EP26BA012""public""763c969b52da4ef49b1b791742b6dd6b""0"4"0""https://pieetraining.eb.mil/wbt/xhtml/wbt/sol/index.xhtml"0"link""1""2026-07-10T13:22:46.304+00:00""cc169faa7a82444a85e9eef762c07e14""public""0""Web Based Training for the PIEE Solicitation Module""public""f219b1c2715c45a8b472414811227169""0"3"0""https://www.acq.osd.mil/asda/dpc/ce/cap/docs/piee/PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf"0"link""1""2026-07-10T13:22:46.304+00:00""2278eed9a685408c8a9a4e4fbb18727e""public""0""Registration Instructions for the PIEE Solicitation Module""public""232af86996b74741b7e93d67a4f8d224""0"2"0""https://dodprocurementtoolbox.com/"0"link""1""2026-07-10T13:22:46.304+00:00""99baf8b358a849df8156b11a47a5b013""public""0""Department of Defense Procurement Toolbox""public""c862b8269807442784121fd0826721e2""0"1"0"Source: SAM.gov (notice d7bb9b090c514510b7e4650600faf04b), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.