Upgrade the existing heating infrastructure in building 1515 on Hill AFB in accordance with the Statment of Work. The objective is to transition from the current steam heat exchanger system to a more efficient, decentralized gas-fired hot water boiler system.
The contractor shall provide all labor, materials, equipment, transportation, and supervision necessary to design and construct the replacement heating system. The core scope includes: complete design and engineering services (mechanical, electrical, controls); demolition and safe removal of the entire steam exchange system; installation of new high-efficiency, gas-fired hot water boilers (RBI Futera III or approved equivalent) with N+1 redundancy; installation of natural gas piping, venting, hydronic piping, pumps, tanks, and valves; integration of the new boiler system into the facility’s existing Direct Digital Control (DDC) / Energy Management Control System (EMCS) with native BACnet compatibility; and full commissioning, testing, adjusting, and balancing (TAB) of the hydronic system.
We post new hvac opportunities in Utah as agencies publish them. Get them in one email — free, and unsubscribe whenever.
"84056-5805""HILL AFB""UT""USA""CP 801 586 8482""6038 ASPEN AVE BLDG 1289""16292 Solicitation Boiler Replacement Amd 1.pdf"293005"file"".pdf""1""2026-10-02T17:08:14.776+00:00""8dd2208b74774100be5095d3c6e65e6b""public""0""public""8372507f55e54849b492d55ee7c4047f""0"24"0""A001 - Conceptual Design Drawings Models DI-SESS-8100E.pdf"56908"file"".pdf""1""2026-09-29T20:46:47.845+00:00""2b97a98bdb334bb5a447ee852c794037""public""0""public""894a0134e16146ae9776fac1e6d19d22""0"23"0""A005 - System Safety Program Plan DI-SAFT-81626.pdf"56947"file"".pdf""1""2026-09-29T20:46:47.845+00:00""6d95c17115fb4556b90ed2ea0af6a9d1""public""0""public""2d31dbc7728e4164b0f8ac9289aa2fba""0"22"0""A004 - As Built Configuration List DI-SESS-81830.pdf"56907"file"".pdf""1""2026-09-29T20:46:47.845+00:00""dd0e80fd0e9343ddb5a1ad1819d695c6""public""0""public""2e9e0cb139834ed1bbc29be9a09dce8f""0"21"0""A006 - Accident-Incident Report DI-SAFT-81563.pdf"56875"file"".pdf""1""2026-09-29T20:46:47.845+00:00""080d538da27d42c2a409e9feb2642083""public""0""public""03060d2261974007a7faf3fb26579ff6""0"21"0""A003 - Quality Assurance Program Plan (QAPP) DI-QCIC-81794B.pdf"56926"file"".pdf""1""2026-09-29T20:46:47.845+00:00""31716ffaaa4e4e1a88010f92bbbd9cac""public""0""public""2ffb2f6eeeef4b03bccbed2a77586204""0"20"0""A002 - System - Subsystem Specification (SSS) DI-ISPC-81431A.pdf"56892"file"".pdf""1""2026-09-29T20:46:47.845+00:00""6f288b12565d4efaa428873f00dc8e5f""public""0""public""ee3268884e7840d887a52f44fd575a6e""0"19"0""Phase 2 as-built mechanical.pdf"16060509"file"".pdf""1""2026-09-29T16:35:12.28+00:00""d69358b2f1344dfcabb270fae27cc6c8""public""0""public""08712bb002874d48a06990e725b47979""0"18"0""Phase 1 as-built mechanical.pdf"2625127"file"".pdf""1""2026-09-29T16:35:12.28+00:00""3f9de63f608b43b19ca083591a5568ca""public""0""public""35bb9a9ded1b494a976a649cc33ee3c6""0"17"0""Pages from FY06 FY07 As-Builts Vol 2.pdf"1895432"file"".pdf""1""2026-09-29T16:35:12.28+00:00""aabc726ed1004a1aa79f20b8300cb137""public""0""public""aa314c2bda9043aab729716c6863e85e""0"16"0""G14_Hill_AFB_IFS_Electrical.pdf"409456"file"".pdf""1""2026-09-29T16:35:12.28+00:00""3148d4e5aa774f659917ef7cd987e9cf""public""0""public""0871025ad9f24deb94683e10efb0008f""0"15"0""G10_Hill_AFB_IFS_Natural_Gas_LPG.pdf"212564"file"".pdf""1""2026-09-29T16:35:12.28+00:00""cb8bd2e525df4d85bb28e86186578588""public""0""public""7805909ae0d14e1a8482d8c16aeadf61""0"14"0""G07_Hill_AFB_IFS_Mechanical_Systems_Design_Requirements.pdf"476643"file"".pdf""1""2026-09-29T16:35:12.28+00:00""c5839e74c6b34a75ae703e2c467fde96""public""0""public""eb43a3ed73514535a275bcee6c911f2b""0"13"0""B1515 phases 3 and 4 gas lines.png"305050"file"".png""1""2026-09-29T16:35:12.28+00:00""6a62f0b597d0491c95ac11fd96e60b93""public""0""public""f2077f27a8b64cc3b0dde4d96edc5dcb""0"12"0""B1515 phase 2 gas line.png"259714"file"".png""1""2026-09-29T16:35:12.28+00:00""cf5a9045bf7a4b6c86788aedf532658a""public""0""public""50062028143d447b98cf6d0c41577646""0"11"0""B1515 phase 1 gas line.png"177697"file"".png""1""2026-09-29T16:35:12.28+00:00""ebb9640239e749aebb26b3403fc3166d""public""0""public""8fbec971ed1e42ee9efb60b358223c34""0"10"0""3-inch gas line at B1515.png"1037554"file"".png""1""2026-09-29T16:35:12.28+00:00""38de3e92aecc4313aecdbdc0cf93de13""public""0""public""64bffafe7ba54097b72afc67669c25d7""0"9"0""RFIs for Bldg 1515.xlsx"32842"file"".xlsx""1""2026-09-29T16:35:12.28+00:00""427bd56d72bb4b8db0159d52496f70bb""public""0""public""77e89bd91555488ea44ec4ea3b36a4b3""0"8"0""16292 Boiler Replacement SOW (9-4-26) Final.pdf"662219"file"".pdf""1""2026-09-29T16:35:12.28+00:00""7374adcdd5924ce1b6a0ee2716480334""public""0""public""820a9c939f7549c0856a931221faf221""0"7"0""Bldg- 1515 WT 18773888 Removal of Steam Lines.pdf"297819"file"".pdf""1""2026-09-29T16:35:12.28+00:00""0879183637964317ab05b27e72eada40""public""0""public""66cff1396007408fb0f763cad131c4b8""0"6"0""16292_Wage Determinations.pdf"62669"file"".pdf""1""2026-09-29T16:35:12.28+00:00""de042dc459c445c795747813f147f2f0""public""0""public""ca869e91abf84cc695d50470aaa874aa""0"4"0""16292 Solicitation Boiler Replacement.pdf"293767"file"".pdf""1""2026-09-29T16:35:12.28+00:00""9e7701ef6762485da0711b3527cc9ec0""public""0""public""b672883d189944949e3409c901da497e""0"3"0"Most Utah work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: SAM.gov (notice d1eec64cbb114df5b5115db22b81e01e), retrieved via the SAM.gov Get Opportunities API. View the official posting, and always confirm requirements and deadlines with the issuing agency.