We post new equipment maintenance & rental opportunities in Kentucky as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Work for this project requires the contractor to be responsible for for furnishing and supplying all labor,
materials, equipment, utilities, miscellaneous items, freight and delivery and all
necessary valid licenses for the work summarized in the SOW:
aeration equipment disconnect.
pipe bollards, and conduits.
following:
a. Control panel with individual motor overload protection circuit breakers.
b. Self-contained floating microbubble aerators cord connected to control panel
with tethers and anchors (4 each).
provide location on as-built plans with reference measurements to existing
infrastructure.
The magnitude of this project is between $25,000.00 and $100,000.00
This Pre-solicitation Notice seeks to provide information to interested parties about potential opportunity to perform the construction, additions, alterations, or maintenance and repairs as described above. This Pre-solicitation Notice does not commit the Government to contract for any supply or service. Respondents are advised that the United States (U.S) Government will not pay for any information or administrative cost incurred in response to this Pre-solicitation Notice. All costs associated with responding to this Pre-solicitation Notice will be solely at the responding party's expense. Please be advised that all submissions become Government property and will not be returned. Responses to this notice are not offers and cannot be accepted by the U.S Government to form a binding contract.
The solicitation will be on or about 20th November, no additional information is known at this time.
The contractor must furnish and install a 480V, 3PH, 30A feeder from an existing panelboard to proposed aeration equipment disconnect; furnish and install a 480V, 3PH, 30A disconnect including grounding system, post, pipe bollards, and conduits; furnish and install a microbubble lagoon aeration system consisting of a control panel with individual motor overload protection circuit breakers and four self-contained floating microbubble aerators cord connected to the control panel with tethers and anchors; locate private and utility owned buried electrical lines in the area of work and provide location on as-built plans with reference measurements to existing infrastructure; and furnish third-party inspection of electrical work included in this contract.
"US""US""30309""Washington""GA""USA""SPOC EAST""1720 PEACHTREE ROAD NW"Source: SAM.gov (notice cf3e20b052864a8b97085e8029b95d30), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.