This project is for the removal of 2 half-walls in the waiting area at the U.S. Embassy Consulate in 1010 Vienna.
Interested parties shall prepare and submit a quotation according to the detailed tender documents that will be published in the next step of procurement/solicitation notice.
Tender specifiations: General Contractor for Construction work, Flooring and Electrical Installation
The SOW consists but is not limited to the following:
Dust Protection: temporary dust screen made of strong plastic sheeting around the demolishing area (floor to ceiling)
Site installation & Logistics Complications: City centre, vehicle access, hotel-office building in operation, neighbors, operating hours, restricted working hours, security measures
Demolition, removal and disposal of 2 half-walls: concrete bricks (length sum +14.5m, height=1.3m) and adjacent floor in all layers
Electrical installations Dismantling of switches, sockets, wiring in half walls and floors before demolition; new switches/sockets/wires to be installed in existing walls.
Filling of the area in the floor+ new flooring (screed, impact sound insulation, laminate flooring)
Site-Cleaning renovation area and all affected areas in the building
Special requirements
The work will be carried out in short time slots (incl. night & weekend) while the facility remains in operation and in the presence of the employees and clients who should not be disturbed during the construction work
USG Security regulations
Clearance process for employees, cars, material on site
Safety and protective measures
Execution periods
Indicative construction schedule: 4-5 days in fall 2026
The contractor shall furnish all labor, material, equipment, and services for the removal of 2 half-walls (concrete bricks, length sum +14.5m, height=1.3m) and adjacent floor in all layers; provide dust protection with temporary dust screen; dismantle switches, sockets, wiring in half walls and floors before demolition and install new switches/sockets/wires in existing walls; fill the area in the floor and install new flooring (screed, impact sound insulation, laminate flooring); and perform site-cleaning of the renovation area and all affected areas in the building. Work will be carried out in short time slots (incl. night & weekend) while the facility remains in operation.
"US""20520""WASHINGTON""DC""USA""DEPARTMENT OF STATE, 2201 C ST NW""19AU9026Q0011_cover letter.pdf"591693"file"".pdf""1""2026-08-07T07:45:54.048+00:00""85dacd89871248adbc6d2777309558e9""public""0""public""4f4ab54e0cc4472d968ecb921348ffb3""0"7"0""19AU9026Q0011_SF-1442.pdf"788826"file"".pdf""1""2026-08-07T07:45:54.048+00:00""0bb7ecd2cb09459dbf762506b4451137""public""0""public""4378527ab9c948519a478c13b184fc52""0"6"0""19AU9026Q0011_Solicitation Doc.pdf"427435"file"".pdf""1""2026-08-07T07:45:54.048+00:00""61805797f91343d79ea9b459724a30af""public""0""public""50f121336fc240c6a8f5e2b5e89d07f4""0"4"0""19AU9026Q0011_SOW_en.pdf"568234"file"".pdf""1""2026-08-07T07:45:54.048+00:00""b34d42298591475682f420cafc3880d9""public""0""public""d37bbbc4b0ce4ba6a529393fbae454ca""0"3"0""19AU9026Q0011_SOW_de.pdf"644657"file"".pdf""1""2026-08-07T07:45:54.048+00:00""4b6999145ea2432485f690a37f654215""public""0""public""d1289f22558646ca80c9fe44c3b0a03d""0"2"0""19AU9026Q0011_SOW_Att1.pdf"875328"file"".pdf""1""2026-08-07T07:45:54.048+00:00""7c284efbdd8f4822b48ed544a42e5776""public""0""public""eaf80e6d5dc642f8814e74b1b90d7301""0"1"0"Source: SAM.gov (notice ceab2bbdfd114d119050e0a14cb99dd7), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.