AMENDMENT
This amendment serves as official notification that the Request for Quotation (RFQ) for the fabrication and delivery of two custom commercial-grade mobile beverage cabinets has been amended. A revised Statement of Work (SOW) is now attached to the solicitation.
The amended SOW significantly expands the required scope of work to include on-site installation and demolition. Because of this expansion, all quotes received prior to this amendment no longer meet the scope of the solicitation and are considered invalid. Vendors wishing to compete for this contract must submit new quotes based on the updated requirements.
All offerors must review the amended SOW in its entirety. The most significant changes driving this expanded scope include:
Expanded Scope (Installation & Demolition): The contractor must now handle the removal and disposal of the existing equipment and execute the full installation of the newly fabricated cabinets.
Detailed Utility Access Points: Precise, documented dimensions are now provided for utility holes. The contractor must pre-drill these access points in the stainless steel top and backsplash for coffee machines, soda fountains, and water/ice machines.
Internal Configurations: The internal housing specifications have been updated. This includes specific appliance placement and a new requirement for a pull-out bottom shelf to accommodate the bag-in-the-box (BIB) syrup system.
Defined Responsibilities: The SOW establishes clear boundaries for demolition, installation, and utility connections between the Contractor, Government personnel (Civil Engineering
Note: The overall cabinet dimensions, material requirements, and mobility specifications (casters) remain unchanged.
Due to the substantial changes in on-site requirements, previously submitted pricing is no longer technically acceptable.
If you previously submitted a quote: You must submit a brand new, revised quotation that accounts for the expanded scope if you still wish to be considered for award.
For all submissions: Please acknowledge receipt of this amendment when submitting your new quotation.
The contractor shall provide all materials, labor, engineering, and equipment necessary to fabricate, deliver, and install two (2) custom commercial-grade mobile beverage cabinets. The contractor is also responsible for the removal and proper disposal of the existing beverage cabinets. The cabinets must be 158" Long x 32" Deep x 39" High, constructed of 14-gauge stainless steel top and 16-gauge stainless steel base, with integrated 6" backsplash, 12" solid tray slides, left and right-side doors, and eight 6" casters per unit. The contractor must pre-drill utility penetrations through the stainless steel top/backsplash at specified locations for coffee machines, soda fountains, and water/ice machines. The contractor must transport the cabinets inside Building 400 DFAC and set them completely in place, and coordinate the installation schedule with the Government point of contact.
"83705-8048""BOISE""ID""USA""KO FOR IDANG DO NOT DELETE""4460 S BYRD ST BOISE AIR TERMINAL""Solicitation Amendment W50S7326QA0050001 SF 30.pdf"4018516"file"".pdf""1""2026-08-07T20:30:48.784+00:00""57bcd5c1ae7a45219864f0986659ddfd""public""0""public""0d40a65c8acd428ba77073a88fce8ba3""0"7"0""Solicitation Amendment - W50S7326QA0050001.pdf"3369217"file"".pdf""1""2026-08-07T20:30:48.784+00:00""2d84795ff9fd4303be880cf1e1e5fec8""public""0""public""7916c96250954be6b9074fb44ea11f6d""0"6"0""SOW Mobile_Beverage_Cabinets amended 20260807.pdf"170374"file"".pdf""1""2026-08-07T20:30:48.784+00:00""69de5288ab194d768dd753914ef14125""public""0""public""f33e3f80b58e47338280b3e610449e35""0"5"0""Current Cabinets to be removed.jpg"8679204"file"".jpg""1""2026-08-07T20:30:48.784+00:00""17c87af0e786494f9788344d7fa5461d""public""0""public""9b09e0a4ba4c495386221c000873b658""0"4"0""Solicitation - W50S7326QA005 Bev Cab.pdf"3330551"file"".pdf""1""2026-07-21T19:59:31.179+00:00""d819616971e54f9c846055430341ba6b""public""0""public""7c178260424541b4aa239daa162b159a""0"3"0""Bev Cab Specs.docx"15778"file"".docx""1""2026-07-21T19:59:31.179+00:00""922bc43f245940f89ec7be7eae2e5645""public""0""public""dcd423f3ddd24624b01bc4e7495e5da2""0"2"0""Concept Bev Cab.png"1515481"file"".png""1""2026-07-21T19:59:31.179+00:00""22cdfd5d043e4cd38a2a632ccab20d2c""public""0""public""899c5beef2884e5dbc61db997cc6a854""0"1"0"Source: SAM.gov (notice ce1356de5552474e88580fd0ffe83bc7), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.