We post new goods & materials opportunities in Maryland as agencies publish them. Get them in one email — free, and unsubscribe whenever.
NWS Southern Region WFO Emergency Power Generator Replacement: NOAA’s National Weather Service (NWS) requires the replacement of an existing generator at each of the Weather Forecast Offices (WFO) in the Southern Region. The 14 generators installed will be Kohler 277/480-volt 3-phase and range from 125 to 150 kVA. Option 1 will include fuel tank refurbishment or replacement, Option 2 will replace electrical panels, option 3 will provide building repairs.
Location: Brownsville, TX; Corpus Christi, TX; Jacksonville, FL; Key West, FL; Lake Charles, LA; Slidell, LA; Little Rock, AR; Melbourne, FL; Mobile, AL; Nashville, TN; San Juan, PR; Tampa, FL; and Birmingham, AL: Atlanta, GA.
The contractor shall complete all work outlined in the Statement of Work and applicable attachments for the Generator and ATS Replacements at each of the 14 specified locations. This includes furnishing all professional services, supervision, labor, material, transportation, equipment and services for a firm fixed price. Optional tasks include fuel tank replacement, electrical distribution panel replacement, and generator building repairs at each location, with anticipated exercise dates of 45 or 60 days after award.
"US""US""20910""SILVER SPRING""MD""USA""STRATEGIC SOURCING ACQUISITION DIV.""1325 EAST WEST HWY, RM. 11323""Sol_1305M426Q0048.pdf"683900"file"".pdf""1""2026-08-05T19:13:56.864+00:00""5f7b4de873d7433b9248d8bd9ba3c071""public""0""public""ab06ad8f11034a46ad60ebecfc97bbfa""0"6"0""Attachment_A_-_Wage_Determinations.pdf"46277"file"".pdf""1""2026-08-05T19:13:56.864+00:00""2db3caf167c84cd29cc5a42d47718866""public""0""public""686d9a8a08da4b10814fef0478fd3303""0"5"0""Attachment_B_-_Statements_of_Work.pdf"70212"file"".pdf""1""2026-08-05T19:13:56.864+00:00""e5ddf193ad414baba2f19779d4851a10""public""0""public""f0f86f452b6040628fd8192a028d7dff""0"4"0""Attachment_C_-_Site_Drawings.pdf"69580"file"".pdf""1""2026-08-05T19:13:56.864+00:00""41c0d6de912043cd97e903017fe6d85c""public""0""public""65b23086aa214593ad8873ed10bea3a6""0"3"0""Attachment_D_-_Site_Pictures.pdf"69584"file"".pdf""1""2026-08-05T19:13:56.864+00:00""d279de16a45d4a64a3f4ed21dda4f4c7""public""0""public""49804dc1dccd4a8eb4f7642a0017962e""0"2"0""Attachment_E_-_Past_Performance_Questionnaire_NWS_Southern_Region_WFO_Emergency_Power_Generator_Replacement_(To_Be_Completed).docx"1833046"file"".docx""1""2026-08-05T19:13:56.864+00:00""3a1954ba9ed8406e901bbc731d0da3be""public""0""public""0a723ee0a0cf448db110148f5d23ecd2""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice c3b824c1b6864bb0953ffafa1b2b2966), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.