We post new exterior maintenance opportunities in California as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Contractor shall provide all necessary labor, furnishing and installation of materials, tools, equipment, planning, scheduling, and coordination to paint the complete exterior of the Aviation Ground Support Equipment (AGSE) (Aprox. 4,234 sq ft) building and the Sheet Metal building (aprox. 13,942 sq ft.) This is a combined synopsis/solicitation for construction services prepared in accordance with the streamlined procedures of FAR Part 12 and FAR Part 36, as modified by the Revolutionary FAR Overhaul (RFO) Class Deviations. This announcement constitutes the only solicitation; quotes are being requested and a separate written solicitation will not be issued.
Funds are not presently available for this acquisition. The Government anticipates funds will become available prior to award as this action has been identified on the National Guard priority list. No contract award will be made until appropriated funds are made available.
Solicitation Number: W912LA26QA020
Site Visit Date: See Sec. 00 21 00, Para. 3
Questions Due to contracting Officer: See Sec. 0021 00, Para. 4.3
Quotes Due to Contracting Officer: See Sec. 00 21 00, Para. 5
Product/Service Code: Z1EB
NAICS Code: 238320
Set Aside: 100% Small
Business Size Standard: $19,000,000.00
The contractor shall furnish and install all necessary labor, materials, tools, and equipment, and perform planning, scheduling, and coordination to paint the complete exterior of the Aviation Ground Support Equipment (AGSE) building (approx. 4,234 sq ft) and the Sheet Metal building (approx. 13,942 sq ft). The work includes painting the exterior of the Sheet Metal building, including the 3 exhaust vents on top of the roof. The contractor must submit product data sheets, Safety Data Sheets (SDS) for all paints, primers, solvents, and sealants, and physical paint samples (2'x2') applied on-site for color approval within 10 days after NTP and prior to ordering materials. Closeout documentation includes a contractor's letter of warranty (1-year minimum), waste disposal manifests, electronic before-and-after photos, and a contractor release of claims.
"93451-5000""SAN MIGUEL""CA""USA""KO FOR CAARNG DO NOT DELETE""903 INDUSTRIAL AVE""W912LA26QA020_26SUS001_TASMG Painting.pdf"6506109"file"".pdf""1""2026-07-28T19:36:27.43+00:00""c721b26ff8734531b2b5a714dccf033d""public""0""public""07357a24b750466daa7f6234248f8e61""0"14"0""W912LA26QA020_Att.01_SOW_20260727.pdf"1536385"file"".pdf""1""2026-07-28T19:36:27.43+00:00""8a7fe8bcb3324aa69189d7161d8450ef""public""0""public""3ae87bc42c504864ae4cc48a7c79d4c9""0"13"0""W912LA26QA020_Att.02_SPECS_20260727.pdf"1494418"file"".pdf""1""2026-07-28T19:36:27.43+00:00""2a10074726b84a81828b1f14e77b612b""public""0""public""20da8758c77d48fbbccd6c6748e7bc30""0"12"0""W912LA26QA020_Att.03_Monthly Precipitation.pdf"557455"file"".pdf""1""2026-07-28T19:36:27.43+00:00""193cc8af6cfd4e3b8f5cf90511121651""public""0""public""843349822e4640079c2eddff04fd0f79""0"11"0""W912LA26QA020_Att.04_WD_CA20260018_20260714.pdf"1534854"file"".pdf""1""2026-07-28T19:36:27.43+00:00""eb33c7adbe0d40f58dc229005af4e922""public""0""public""73967c60f3294e76b27c3edd5702d283""0"7"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice b4d83903ce5a43f1967228de61768aaf), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.