Amendment 2 is now posted in theAttachments/Links section of this posting. The purpose of this amendment is to:
Include clauses in the solicitation that were inadvertently not included. The revised solicitation is posted in the Attachments/Links section.
Provide further clarification that the General Contractor licensure/registration in the State of Florida requirement is for the Prime Contractor. The Prime cannot utilize the the subcontractor's licensure/registration to fulfill this requirement.
The quote due date is not extended due to this Amendment.
July 24,2026
Amendment 1 is now posted in the Attachments/Links section of this posting. The purpose of this amendment is to:
Provide answers to questions from Industry that were submitted by the July 2, 2026 deadline.
Upload the following the Geotechnical Engineering Report and Statement of Work.
Extend the quote submittal date from August 10, 2026 to August August 17, 2026 at 2:00 PM ET.
Disclosure of Magnitude of Construction Projects:
☐ Less than $25,000.
☐ Between $25,000 and $100,000.
☐ Between $100,000 and $250,000.
☐ Between $250,000 and $500,000.
☐ Between $500,000 and $1,000,000.
☐ Between $1,000,000 and $5,000,000.
☒ Between $5,000,000 and $10,000,000.
☐ More than $10,000,000.
June 18, 2026
Offerors are highly encouraged to attend the site visit on June 24, 2026 at 9:00 AM. See Attachment
7- Site Visit Information- JSB for further details. Please submit your RSVP via email to Jalisa.sims@usda.gov.
June 9, 2026
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 12445226Q0008 is issued as a Request for Quotation (RFQ) for to remove one (1) existing boardwalk system and construct one (1) new boardwalk system within the Ocala National Forest. The new boardwalk system will utilize a modular system with post-on-pin foundations. Specialty structures such as overlooks, the kayak launch, and the Pedestrian Truss Bridge are also included in the project.
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990. The small business size standard is $45 million. This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
The project consists of the removal of one (1) existing boardwalk system and construction of one (1) new boardwalk system within the Ocala National Forest. The new boardwalk system will utilize a modular system with post-on-pin foundations. Specialty structures such as overlooks, the kayak launch, and the Pedestrian Truss Bridge are also included in the project. The contractor must provide a technical approach, quality control plan, past performance information, and pricing for all items. The period of performance is 365 calendar days after notice to proceed.
"US""US""303092449""Atlanta""GA""USA""1720 Peachtree ST NW STE 876S""C05_Solicitation 12445226Q0008- Amendment 2.pdf"226229"file"".pdf""1""2026-08-10T15:52:49.446+00:00""0709663161ef4ff4b702f89d5cd05fd6""public""0""public""d81218a63d554b0dae47c58e81419afa""0"53"0""C05_Solicitation 12445226Q0008 Revision 2- Juniper Springs Boardwalk.pdf"321412"file"".pdf""1""2026-08-10T15:52:49.446+00:00""8cc54ee4ff80475885a1fa6739790f04""public""0""public""ff90a108f50646cabdb5fc30755d00bf""0"52"0""SF 1442- Juniper Springs.pdf"324907"file"".pdf""1""2026-07-24T14:55:55.361+00:00""7984d5c7f1a84954bac24f102f6f2f19""public""0""public""eb984f63439c4c0c9e7f8fe3c315dd88""0"50"0""C05_Solicitation 12445226Q0008- Amendment 1.pdf"363242"file"".pdf""1""2026-07-24T14:31:59.576+00:00""449deb994c734d7fb319feac4cb632f8""public""0""public""35d06a2ebc58464f8560990ae5032d29""0"49"0""C04 Attachment 1- JSB SOI.xlsx"308238"file"".xlsx""1""2026-06-09T14:55:28.237+00:00""2d1c23fef555403c94c902ac5907e87c""public""0""public""d5124fd1051747408b251aed5f2a34a2""0"47"0""C04 Attachment 2- JSB Replacement Construction Drawings.PDF"20174183"file"".pdf""1""2026-06-09T14:55:28.237+00:00""74bdcea6167c478e9f079aeb8c015f06""public""0""public""eda1734a1eb84b4ca53c4c7567142d5a""0"41"0""C05_ Revised Solicitation 12445226Q0008- Juniper Springs Boardwalk.pdf"320972"file"".pdf""1""2026-07-24T14:31:59.576+00:00""51b743cb3cc6495895f80997e0f51235""public""2026-08-10T15:52:49.446+00:00""1""public""53483ea989914216859a6db3171d8ef6""0"36"0""C04 Attachment 3- JSB Specifications.pdf"243110"file"".pdf""1""2026-06-09T14:55:28.237+00:00""62795be5f1ec4935bc93dabaa14c5645""public""0""public""3a03f5294f4046ecbbc8e344274afe36""0"33"0""C04 Attachment 4- Juniper Springs Rec Area Location Map.jpg"2616266"file"".jpg""1""2026-06-09T14:55:28.237+00:00""3146ffa904c64de6843de242b7e7a425""public""0""public""d8a560fa42df4938b1000e1b3af32d5e""0"28"0""C04 Attachment 5- Juniper Springs Site Map.jpg"75926"file"".jpg""1""2026-06-09T14:55:28.237+00:00""4dec094cbe5348039aa6ec555c0aebb2""public""0""public""f397f6b662d4431aa71f0840ef1c53e7""0"24"0""C04 Attachment 6-Davis Bacon Wage Determination- Marion County.pdf"61060"file"".pdf""1""2026-06-09T14:55:28.237+00:00""19d35af9ec4444a6994178e1e8996cb2""public""0""public""36dc82c140bd44e5ac2ae04a73e2dcf5""0"19"0""C04 Attachment 8- Contractor Quality Control Plan.pdf"82782"file"".pdf""1""2026-06-09T14:55:28.237+00:00""ce7cb5bcd5084a3d9fab0cd0c35912c2""public""0""public""d3d94fcc28084b39b73c366fa76815ad""0"12"0""C04 Attachment 7- Site Visit Information- JSB.pdf"412815"file"".pdf""1""2026-06-09T14:55:28.237+00:00""c30b7207b4dc4d68b5bf99e6be36d295""public""0""public""f353779d3b8e4098a222b32c84a9ba72""0"8"0""C04 Attachment 9- Past Performance Questionnaire.pdf"168545"file"".pdf""1""2026-06-09T14:55:28.237+00:00""aba011f89b25440b808758fc58f171a6""public""0""public""b16b416badaa4256b313c85821790887""0"5"0""C05_Attachment 10- Juniper Exploration Report of Geotechnical Engineering.pdf"3910189"file"".pdf""1""2026-07-24T14:31:59.576+00:00""1d830b8b7cbd4505862a6edbfb1c68ad""public""0""public""e8d34ce91e5e4ad9a7f53dc26ccb89d0""0"4"0""C05_Attachment 11- Statement of Work - Juniper Springs Boardwalk Construction.pdf"443631"file"".pdf""1""2026-07-24T14:31:59.576+00:00""791744d8ce9844da85a5c505469a74f7""public""0""public""d1562fb66ca74835bd8f4df3196db765""0"3"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.