127EAW26Q0050 - Ash Creek Helispot Construction: A00002 - RFI Responses
This purpose of this amendment is to post RFI respsonses.
Attached is "127EAW26Q0050 - RFI Log" which is hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
//////////////////////////////////////////////////////////////////////////////////////////////////////////
127EAW26Q0050 - Ash Creek Helispot Construction: A00001 - Schedule of Items Revision
This purpose of this amendment is to post a corrected Schedule of Items.
Attached is "2. Schedule of Items - Revision 01" which is hereby incorporated into any subsequent contract award. Failure to use the revised documents and requirements revised within will result in your proposal being non-responsive.
//////////////////////////////////////////////////////////////////////////////////////////////////////////
127EAW26Q0050 - Ash Creek Helispot Construction
Set Aside: Total Small Business Set Aside
IMPORTANT NOTES:
See Section "Required Quote Submission Documents" for the Documents to Submit with Your Proposal
A FS organized site visit will NOT be held. The project locations are open to the public and can be viewed by each prospective offeror. In no event shall failure to inspect the site constitute grounds for a claim after contract award.
Requests For Information (RFI’s) are required to be submitted on attachment “RFI Form” and are due to the Contracting Officer (Gregory.Cunningham@usda.gov) via email no later than July 31st, 2026, 10:00 AM Pacific Time. No questions will be accepted after this date and time.
All quotes shall be emailed to the Contracting Officer (Gregory.Cunningham@usda.gov) no later than August 13th, 2026, 10:00 AM Pacific Time.
Work includes clearing and grubbing, over-excavation, screening in-situ soils, re-compaction, borrow excavation, fill placement, grading, aggregate surfacing, construction of reinforced concrete helipad, water system modifications, potential electrical and telecom duct installation, and associated tasks described in the Project Plans.
"US""US""871023498""Albuquerque""NM""USA""333 Broadway BLVD SE""A00002 - RFI Responses.pdf"772790"file"".pdf""1""2026-08-04T23:01:50.756+00:00""0a9d982a31d2448fb0039a605e982d3d""public""0""public""bc57480d720a4791839dd3c7532f8f34""0"15"0""A00001 - Schedule of Items Revision.pdf"164140"file"".pdf""1""2026-07-22T20:21:11.459+00:00""2c0126baca964b1082bb307b2a8da584""public""0""public""9ee263773f0f4b21a583756478188000""0"14"0""2. Schedule of Items - Revision 01.pdf"196119"file"".pdf""1""2026-07-22T20:21:11.459+00:00""47a22a567096427aa873f60368606a1d""public""0""public""62c21888ee4b49409a58cfb56ef7a519""0"13"0""127EAW26Q0050 - Ash Creek Helispot Construction.pdf"608963"file"".pdf""1""2026-07-14T18:29:37.696+00:00""6c3868d415cf408ea680a92374fe8672""public""0""public""5200987d520a49f08b58e2c0c0287907""0"12"0""1. Statement of Work.pdf"937862"file"".pdf""1""2026-07-14T18:29:37.696+00:00""f8a6389d81614778977b81ac39641efa""public""0""public""e8e8129b00ca4180a907ff040ef1334e""0"11"0""2. Schedule of Items.pdf"71214"file"".pdf""1""2026-07-14T18:29:37.696+00:00""caf56e7d115145828443b477c62d2d14""public""2026-08-04T23:01:50.756+00:00""1""public""7b8dbc11e9c046e8bf996f511842e39a""0"10"0""3. Project Plans.pdf"18452184"file"".pdf""1""2026-07-14T18:29:37.696+00:00""7ba511a677a24f40b9d2e7003fe0bdc1""public""0""public""370b873fbde64a51b0496640fb8d614b""0"9"0""4. Project Maps.pdf"2391836"file"".pdf""1""2026-07-14T18:29:37.696+00:00""1377d55afe0a436b94cda802da9da8b8""public""0""public""397f908f66e54939b86316e4c7c31d12""0"8"0""5. Forest Service Supplemental Specifications (FSSS).pdf"691201"file"".pdf""1""2026-07-14T18:29:37.696+00:00""60629486e21c46bbbffc8ac9a6c109da""public""0""public""0a8cfb2ee38346d3a9807186c8ae66cd""0"7"0""6. Utility Supplemental Technical Specifications.pdf"206901"file"".pdf""1""2026-07-14T18:29:37.696+00:00""179052ee54844494bbd9451ce5f7a4ce""public""0""public""9d2f61b0174541949819118c62cd0b0b""0"6"0""7. Borrow Excavation Exhibit.pdf"126180"file"".pdf""1""2026-07-14T18:29:37.696+00:00""095edca20bf14584aea3f10e9879cf15""public""0""public""21772f32fe144b3bb47eb303b1423b49""0"5"0""8. Fire Plan.pdf"430218"file"".pdf""1""2026-07-14T18:29:37.696+00:00""6f7ed4fb2f994fa99bcb83b174de116c""public""0""public""4088279df55f4b55b82bf341436deada""0"4"0""9. Contract Administration Information.pdf"284960"file"".pdf""1""2026-07-14T18:29:37.696+00:00""8974e6ac15874d0bbd03b95d98c0de20""public""0""public""53ab75d758b34f2b840bd4d44273f207""0"3"0""10. Wage Determination CA20260007 Mod 4 (May 18, 2026).pdf"178352"file"".pdf""1""2026-07-14T18:29:37.696+00:00""e0d176a2251a4d38beefe66daead75fe""public""0""public""6e5ac5cff11640528ac93a97dc800313""0"2"0""11. RFI Form.xlsx"13390"file"".xlsx""1""2026-07-14T18:29:37.696+00:00""e21a7d3d53394ffb8c47a7c40cf8ae09""public""0""public""35c51553d96c4556880f463ba666dc44""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.