We post new hvac opportunities in Texas as agencies publish them. Get them in one email — free, and unsubscribe whenever.
The mission and Installation Contracting Command (MICC)- Ft. Bliss, TX intends to issue an Invitation for Bids (IFB) to award a single firm-fixed-price contract to provide for the construction and completion of the work described. The Contractor shall furnish all labor, material, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Contractor shall replace 6 HVAC Carrier rooftop units with new TRANE HVAC units of the same capacity as listed in the building schedule or approved equivalent. Work is located at building 1611, within the Fort Bliss TX Installation.
The contract duration is 270 days after notice to proceed. This project is a Total Small Business set aside. The North American Industry Classification System (NAICS) code is 238220, with a size standard of $19,000,000.00. The magnitude of construction is between $1,000,000 and $5,000,000. The solicitation will result in a Firm-Fixed-Price (FFP) contract.
Please see attached solicitation and supporting documents.
If you will be hand delivering your bid before the bid opening, you shall coordinate drop off by e-mailing SFC Shawn Munro at shawn.t.munro.mil@army.mil & Flor Sanchez at flor.f.sanchez.civ@army.mil.
If you will be mailing your bid via UPS, USPS, or FedEx, please e-mail tracking number to SFC Shawn Munro at shawn.t.munro.mil@army.mil & Flor Sanchez at flor.f.sanchez.civ@army.mil.
The contractor shall furnish all labor, material, equipment, tools, transportation, and supplies necessary to replace 6 Carrier rooftop units (A8, A10, A11, A12, A14, A15) with new TRANE units of the same capacity or approved equivalent at Building 1611, Fort Bliss, TX. Work includes providing high-efficiency units, hail guards, programmable thermostat sensors, filters, factory-made adapt-a-curb, economizer, barometric relief, hinge access doors, compressors, and all associated appurtenances. The contractor must seal all roof penetrations, install new ductwork per SMACNA standards, provide and install condensate piping, perform electrical connections including new breakers and disconnects, test and balance the new units by an independent TAB contractor, and remove and reinstall smoke detectors. The contractor must also recover and dispose of R-410A freon, provide temporary cooling/heating during construction, and comply with all applicable codes and regulations. The work is in an occupied facility (the Post Exchange) and must be coordinated with the COR and tenant.
"79916-6812""FORT BLISS""TX""USA""BLDG 2021""1733 PLEASONTON ROAD""Site Visit Sigh-In Sheet for W911SG26BA008 and 009.pdf"869761"file"".pdf""1""2026-07-30T17:25:05.579+00:00""082fb2c891a444d1a59d7490d9496954""public""0""public""ab5e7203ad304c9885fce0781b5e8d42""0"10"0""Solicitation - W911SG26BA009.pdf"6611251"file"".pdf""1""2026-07-21T15:17:53.789+00:00""d20ff7ceaa43498a9eaf20a87e92d8d8""public""0""public""780152c33fe04edbad1943599d26ca0e""0"9"0""SOW- FY26_replace 6Carrier_RTUs_20MAY26.pdf"328387"file"".pdf""1""2026-07-21T15:17:53.789+00:00""232698960c7e4ddf959db4975be627c4""public""0""public""7e8dc1c6c40b416ca40bbdd7a96cc199""0"8"0""schedules_RTUS_1611.pdf"3009108"file"".pdf""1""2026-07-21T15:17:53.789+00:00""df5e268675b64b8ab3672cd41d9c817f""public""0""public""1de2e129bb6c4d419117460f20976e8a""0"7"0""As-Builts MEP.pdf"118831416"file"".pdf""1""2026-07-21T15:17:53.789+00:00""75411416e3ed4f13819df7ce7d175b79""public""0""public""1f8990a6523d4bdfaf0e0e663453a5c1""0"6"0""Wage Determination TX20260245.pdf"72730"file"".pdf""1""2026-07-21T15:17:53.789+00:00""ff336073babf4dd4bc85e188f0d85197""public""0""public""d3fc25786fb74746bea386703057b4d4""0"1"0"Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
Source: SAM.gov (notice a526bf91712f4fc2be52975eca7746bc), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.