We post new asphalt opportunities in Montana as agencies publish them. Get them in one email — free, and unsubscribe whenever.
MT FLAP BLACKF 12(1) FLAP Rehabilitation Two Medicine Road / MT NP GLAC 12(2) FLTP Rehabilitation of Two Medicine Road
The work consists of reconstruction of asphalt pavement roadway, replacement of existing culverts, and mill and overlay of two parking areas and other small items of work.
Project length: 7.22 miles
Tentative Fixed Completion Date: Fall 2027
(Once solicitation is issued, see FAR Clause 52.211-10 for exact date.)
Estimated Price Range: $15,000,000 and $25,000,000
Project Location: This project is located approximately 4 Miles NW of East Glacier, MT
See Attachments for additional information.
The work includes reconstruction of asphalt pavement roadway, replacement of existing culverts, mill and overlay of two parking areas, and other small items of work. Specific line items include mobilization, construction survey and staking, contractor quality control, contractor testing, construction schedules, soil erosion control (fiber roll, check dams), watering for dust control, clearing and grubbing, removal of pipe culverts, signs, curb, curb and gutter, sidewalk, plugging existing pipe, roadway excavation, subexcavation, select borrow, boulder removal, separation geotextile, geogrid, reinforcement geosynthetic, roadway obliteration, placed riprap (classes 2-5), aggregate base courses, ditch reconditioning, full depth reclamation, asphalt concrete pavement, tack coat, asphalt pavement milling, pipe culverts (12-inch to 120-inch), end sections, standard underdrain system, lining of pipe culverts, concrete curb, curb and gutter, sidewalk, concrete pad, water system, sewer system, bollards, turf establishment, wetland plantings, rolled erosion control product, sign system, pavement markings, temporary traffic control (barricades, drums, portable traffic barrier, construction signs, flaggers, traffic control supervisor), electrical system installation, utility boxes, utility trench, environmental design (streambed channel reconstruction, wetlands mitigation), and a project lump sum for Blackfeet Impact Fee.
"US""US""98661""VANCOUVER""WA""USA""DOT FEDERAL HIGHWAY ADMIN""610 E FIFTH STREET""Project Description_MT FLAP BLACKF 12(1) FLAP Rehabilitation Two Me.pdf"149454"file"".pdf""1""2026-03-03T18:45:28.476+00:00""36c0727bdef94730942e760790ee6dfb""public""0""public""a1c7bf7d5e294eceb2582ba98e60d2fe""0"1"0"Source: SAM.gov (notice a3aff653a57a4ab69790bc5ba7e5d741), retrieved via the SAM.gov Get Opportunities API. View the official posting , always confirm requirements and deadlines with the issuing agency.