The Town of Haymarket is requesting bids for the exterior site work at the Town Hall complex. Site Work includes stormwater infrastructure, curb and gutter, repaving and the addition of a turn lane on the adjoining road. Round #1: Uploaded the bid sheet to documents
Site work at the Town Hall complex includes stormwater infrastructure, curb and gutter, repaving and the addition of a turn lane on the adjoining road at the Town Center.
We post new asphalt opportunities in Virginia as agencies publish them. Get them in one email — free, and unsubscribe whenever.
["https://procure.cgieva.com/page.aspx/en/fil/download_public/55B09E18-8262-4674-882F-CF68D5D795E8","https://procure.cgieva.com/page.aspx/en/fil/download_public/832DE2D9-9FD8-4C73-B82D-89D708943C75"]["<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/55B09E18-8262-4674-882F-CF68D5D795E8\"\">SP20220324 Haymarket Town Center Redevelopment Signed ELK 8-2022.pdf</a>","<a href=\"\"https://procure.cgieva.com/page.aspx/en/fil/download_public/832DE2D9-9FD8-4C73-B82D-89D708943C75\"\">Town Center Site Work 2026-003 RFP.pdf</a>"]["55B09E18-8262-4674-882F-CF68D5D795E8","832DE2D9-9FD8-4C73-B82D-89D708943C75"]["SP20220324 Haymarket Town Center Redevelopment Signed ELK 8-2022.pdf","Town Center Site Work 2026-003 RFP.pdf"]["60219514","544762"]"http://www.w3.org/2001/XMLSchema-instance"["10/1/26","10/1/26"]["Town Center Site Plan ","Town Center Exterior Site Work RFP#2026-003"]["RFx Document","RFx Document"]Most Virginia work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Virginia eVA (solicitation IV129406), retrieved via Virginia's eVA statewide eProcurement marketplace. View the official posting, and always confirm requirements and deadlines with the issuing agency.