- Org
- TAMU
- Type
- ITB
- Title
- Construction of CEA Research Greenhouse in Dallas, TX
- Number
- AG-RSCH-ITB-6614
- Source
- TAMU
- Status
- Open
- Event Id
- 1439663
- Open Str
- 9/16/2026, 8:00 AM CDT
- Pdf Text
- 22 September 2026
Construction of CEA Research Greenhouse in Dallas, TX
Construction of CEA Research Greenhouse in Dallas, TX
22 September 2026
Open 9/16/2026, 8:00 AM CDT Type Invitation to Bid
Close 10/16/2026, 2:00 PM CDT Number AG-RSCH-ITB-6614
Currency US Dollar
Sealed Until 10/16/2026, 2:00 PM CDT
22 September 2026
Contacts
Morgan Helpert
MORGAN.HELPERT@AG.TAMU.EDU
Phone +1 979-314-5839
22 September 2026
Commodity Codes
None Added
22 September 202622 September 202622 September 202622 September 202622 September 202622 September 202622 September 202622 September 2026
Description
Introduction:
Texas A&M AgriLife Research is seeking bids for the construction of a greenhouse at its Research and
Extension Center in Dallas, TX. Bidders shall offer a unit price response for each line item in this bid. Please
read the terms and conditions carefully. If you would like additional information concerning our purchasing
procedures, please contact the Buyer:
Morgan Helpert, CTCD
Buyer II
Phone: 979-314-5839
Email: morgan.helpert@ag.tamu.edu
Required to View Event
Prerequisites Required to Enter Bid
There are no Prerequisites added to this event.
22 September 202622 September 202622 September 202622 September 202622 September 202622 September 202622 September 2026
Buyer Attachments
1. Addendum #1
2. Addendum #1 - Narrative
3. Addendum #1 - Revised Specifications
4. Addendum #1 - Package 1 Drawings
5. Addendum #1 - Package 2 Drawings
6. Instructions to Bidder
7. Attachment A
8. Cost Breakdown
9. Owner-Contractor Agreement
1
0. Bid Opening Information
1
1. TAMUS Payment Bond - Required Over $25k
1
2. TAMUS Performance Bond - Required Over $100k
22 September 202622 September 202622 September 202622 September 202622 September 202622 September 2026
Questions Required Questions
Group 1: Item Basics
Instructions:
1.1 Bidder affirms that any/all applicable discounts have been applied to, and included in,
the Base Bid amount.
1.2 Are you bidding any alternative or substitute item(s) to the ones that are specified in
this invitation to bid? If so, please ensure those items are clearly indicated.
1.3 Please upload full descriptive literature/technical specifications of item(s) being offered
here.
1.4 Please upload a completed cost breakdown using the Cost Breakdown template provided in the
Attachments section of this bid.
1.5 What is the warranty for the item(s) being offered?
1.6 What is the estimated time to project completion after receipt of a notice to proceed?
1.7 A Subcontracting Plan (SP) is required for bid amounts totaling over $100,000. Is your
total bid over $100,000?
1.8 Please upload your completed Subcontracting Plan here.
Group 2: Export Control
Instructions:
2.1 Are any of the items included in this Invitation to Bid export controlled?
2.2 If applicable, provide the Export Control Classification Number (ECCN) or Category
(EAR or ITAR) for the items being offered.
Group 3: Insurance
Instructions:
3.1
Did you submit a current certificate of insurance that complies with the coverages and
limits set forth in the Specifications document? Please note that failure to maintain the
required insurance for the duration of any resulting agreement may result in
cancellation of the agreement by the Agency.
3.2 If not, then Bidder affirms that, prior to award and issuance of any resulting agreement,
a copy of their current certificate of insurance, compliant with the coverages and limits
as set forth in the Specifications document, will be provided.
Group 4: Terms & Conditions
Instructions:
4.1
Does the bidder agree that the Uniform General Conditions and Owner-Contractor
Agreement shall govern any resulting purchase order? By agreeing, bidder
understands that any terms and conditions attached to the bidder's bid response will be
considered withdrawn. By not agreeing to the terms as written, your bid may be
considered non-responsive.
Group 5: Addenda Acknowledgement
Instructions:
5.1 Bidder acknowledgement of Addendum #1: By selecting 'Yes', bidder confirms they
have read and understood the contents of the addendum, and that their bid submission
is inclusive of any modifications and/or clarifications issued in Addendum #1.
22 September 202622 September 202622 September 202622 September 202622 September 2026
Product Line Items Product Line Items
1.
# Item Name, Commodity Code, Description Allow
Alternates Qty. UOM Requested Delivery
P1 Base Bid 1 JA - Job
95141502 - Greenhouse | 5753 <$100K, 8110
Furnish all labor, materials, and equipment necessary for the
construction of the CEA Research Greenhouse in accordance
with the requirements set forth in the Specifications and
Drawings.
P2 Alternate 1 1 JA - Job
95141502 - Greenhouse | 5753 <$100K, 8110
Additional Pricing for Headhouse Fitout - Provide and install
Remainder of Headhouse and associated fixtures, finishes, and
utilities.
P3 Alternate 2 1 JA - Job
95141502 - Greenhouse | 5753 <$100K, 8110
Additional Pricing for Rain Water Collection System - Provide
and install balance of system, including storage tanks, concrete
pad and remainder of collection system as indicated on
plumbing drawings.
P4 Alternate 3 1 JA - Job
95141502 - Greenhouse | 5753 <$100K, 8110
Additional Pricing for Cryo Bulk Storage Tank Screenwall -
Provide and install decorative screen wall as indicated in the
drawings.
P5 Alternate 4 1 JA - Job
95141502 - Greenhouse | 5753 <$100K, 8110
Additional Pricing for Landscape Plantings - Provide and install
plantings as indicated on detail C/L-102 and associated planting
schedule.
22 September 202622 September 202622 September 202622 September 2026
Service Line Items Service Line Items
There are no Items added to this event.
22 September 202622 September 202622 September 2026
- Close Str
- 10/16/2026, 2:00 PM CDT
- Contact Name
- Morgan Helpert
- Description
- Construction of CEA Research Greenhouse in Dallas, TX
- Contact Email
- morgan.helpert@ag.tamu.edu
- Categorized By
- llm
- Sci Docs Fetched
- Yes