Berkeley County is soliciting bids for construction of 281 LF of 8-inch SDR-26 PVC gravity sewer, six 6-inch double service laterals, two 6-inch single-service laterals, and one 4-ft diameter manhole along Arno Drive in Ladson, SC.
The place of performance is 734 Arno Drive, Ladson SC 29456.
Bids are due October 13, 2026 at 11:00 AM; the solicitation was posted September 9, 2026.
The procurement method is Invitation for Bids (listed as 'Other' in metadata and 'Invitation for Bids' in the document).
The issuing agency is Berkeley County.
The contact is Morgan Cross at morgan.cross@berkeleycountysc.gov.
These takeaways are AI-generated and may be incomplete or wrong. Always verify every detail against the official documents before you bid.
Want to know if you can be bonded for this project? Get prequalified.One free application, soft pull — sized to your work.
Know you can be bonded before you spend a week on the bid
No scramble for a bond at the deadline — it becomes a request form
Construct 281 linear feet of 8-inch SDR-26 PVC gravity sewer.
Install six 6-inch double service laterals and two 6-inch single-service laterals.
Install one 4-foot diameter manhole.
Extend the existing 8-inch gravity sewer line along Arno Drive.
Posted Scope of Work
Berkeley County is requesting bids from qualified firms for the construction of 281 LF of 8-inch SDR-26 PVC gravity sewer, six (6) 6-inch double service laterals, two (2) 6-inch single-service laterals, and one (1) 4-ft diameter manhole along Arno Drive in extension of the existing 8-inch gravity sewer line.
Berkeley County is requesting bids from qualified firms for the construction of 281 LF of 8-inch SDR-26 PVC gravity sewer, six (6) 6-inch double service laterals, two (2) 6-inch single-service laterals, and one (1) 4-ft diameter manhole along Arno Drive in extension of the existing 8-inch gravity sewer line.
Surety · through Light RFPprequal free · bid bond free · p&p 3%
Need a bond for this one? Get prequalified once.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
Prequalified contractors know they can be bonded before they write the bid — and skip the application on every one of these. The bond becomes a request form and a copy of the RFP, not a scramble at the deadline.Prequalify For Bonding →What’s a good guy letter?
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Not finding it?Describe the work in your own words and we’ll search the whole site.Search with AI →
Source: Berkeley County, retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.