This project consists of an interior renovation of the 4th-floor corridor at the MUSC Clinical Science Building. The scope includes selective demolition and reconfiguration of existing spaces, along with new architectural finishes, ceilings, and flooring. Work also includes coordination with abatement contractor.
Delivery Method: Design-Build
Construction Cost Range: 250-350k
Documents: A&E Digital Printing
The project consists of an interior renovation of the 4th-floor corridor at the MUSC Clinical Science Building. The scope includes selective demolition and reconfiguration of existing spaces, along with new architectural finishes, ceilings, and flooring. Work also includes coordination with an abatement contractor.
We post new flooring opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most South Carolina work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Medical University Hospital Authority (MUHA) (solicitation H51-P019), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.