- Items
- MOBILIZATION 1.000 LS, BONDS AND INSURANCE 1.000 LS, REMOVAL & DISPOSAL OF EXISTING PAVEMENT 5,370.000 SY, REMOVAL & DISPOSAL OF EXISTING CURB 2,400.000 LF, BORROW EXCAVATION 2,258.800 CY, MAINTENANCE STONE 64.000 TON, CEMENT MODIFIED RECYCLED BASE (14" UNIF)-CURING METHOD B 20,298.670 SY, PORTLAND CEMENT FOR CEMENT MODIFIED RECYCLED BASE COURSE 698.610 TON, HMA SHOULDER WIDENING COURSE 2,386.540 TON, LIQUID ASPHALT BINDER PG64-22 1,968.896 TON, ARAMID FIBER 838.273 LB, FULL DEPTH ASPH. PAV. PATCHING 6" UNIF. 1,200.000 SY, FULL DEPTH ASPH. PAV. PATCHING 8" UNIF 5,200.000 SY, MILLING EXISTING ASPHALT PAVEMENT 1.5" 9,396.000 SY, MILLING EXISTING ASPHALT PAVEMENT 2.0" 256,532.000 SY, MILLING EXISTING ASPHALT PAVEMENT (VARIABLE) 780.000 SY, ASPHALT SURFACE COURSE TYPE B 27,917.446 TON, ASPHALT SURFACE COURSE TYPE C 3,955.980 TON, ASPHALT SURFACE COURSE TYPE D 190.000 TON, DRIVEWAY PAVING-SURFACE TYPE D 808.125 TON, TRAFFIC CONTROL 1.000 LS, PERMANENT CONSTRUCTION SIGNS (GROUND MOUNTED) 2,939.000 SF, 4" WHITE BROKEN LINES -(GAPS EXCLUDED)-FAST DRY PAINT 73,320.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES)-FAST DRY PAINT 207,876.000 LF, 8"WHITE SOLID LINES(CROSSWALK&CHANNELIZATION)FAST DRY PAINT 6,150.000 LF, 24" WHITE SOLID LINES (STOP/DIAGONAL LINES)-FAST DRY PAINT 3,465.000 LF, WHITE SINGLE ARROW (LEFT, STRAIGHT, RIGHT)-FAST DRY PAINT 141.000 EA, WHITE WORD MESSAGE "ONLY"-FAST DRY PAINT 72.000 EA, WHITE COMBINATION ARROW(STR.& RT.OR STR.& LT.)FAST DRY PAINT 12.000 EA, 4" YELLOW BROKEN LINES(GAPS EXC) - FAST DRY PAINT 26,880.000 LF, 4"YELLOW SOLID LINE(PVT.EDGE&NO PASSING ZONE)-FAST DRY PAINT 254,550.000 LF, 6" YELLOW SOLID LINE ON CURB/MEDIAN - FAST DRY PAINT 2,345.000 LF, 4" WHITE BROKEN LINES -(GAPS EXCLUDED) - EPOXY PAINT SLOW CURE 2,620.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES) EPOXY PAINT SLOW CURE 10,470.000 LF, 4" WHITE BROKEN LINES(GAPS EXCL.)THERMOPLASTIC- 90 MIL. 24,440.000 LF, 4" WHITE SOLID LINES (PVT. EDGE LINES) THERMO.- 90 MIL. 69,292.000 LF, 8" WHITE SOLID LINES THERMOPLASTIC - 125 MIL. 2,050.000 LF, 12IN X 18IN WHITE TRIANG. YIELD BAR (GAPS EXC)THERMO-125MIL 36.000 LF, 24" WHITE SOLID LINES (STOP/DIAG LINES)-THERMO.-125 MIL 1,155.000 LF, WHITE SINGLE ARROWS (LT, STRGHT, RT) THERMO.-125 MIL. 47.000 EA, WHITE WORD MESSAGE "ONLY" -THERMOPLASTIC - 125 MIL. 24.000 EA, WHITE COMBINATION ARROWS(STR&RT.OR STR<)THERMO-125MIL 4.000 EA, 4" YELLOW BROKEN LINES(GAPS EXC)THERMOPLASTIC - 90 MIL. 8,960.000 LF, 4" YELLOW SOLID LINES(PVT.EDGE LINES) THERMO-90 MIL. 84,850.000 LF, PERMANENT CLEAR PAVEMENT MARKERS- MONO-DIR.- 4"X4" 2,476.000 EA, PERMANENT YELLOW PAVEMENT MARKERS MONO-DIR.- 4"X 4" PERM. YEL. 350.000 EA, PERMANENT YELLOW PAVEMENT MARKERS BI-DIR.- 4"X4" 1,901.000 EA, MILLED-IN RUMBLE STRIP 17.928 MI, FURNISH & INSTALL 1.0" SCHEDULE 80 PVC CONDUIT 500.000 LF, FURNISH & INSTALL 2.0" SCHD 80 PVC CONDUIT (DIRECTION.BORED) 800.000 LF, FURNISH & INSTALL NO. 14 COPPER WIRE, 8 CONDUCTOR (GRAY) 2,200.000 LF, FURNISH & INSTL NO. 14 COPPER WIRE,1-CONDUCTOR FOR LOOP WIRE 19,360.000 LF, SAWCUT FOR LOOP DETECTOR 7,046.000 LF, F&I-13"X24"X18"D.ELEC.FLUSH UNDGRD.ENCLOS-(STR.POLY.CONC.)HD 44.000 EA, TEMPORARY ADJUSTMENT OF TRAFFIC SIGNAL EQUIPMENT 9.000 EA, FURNISH & INSTALL RADAR DETECTION CABLE TO CROSS ROADWAY 1,500.000 LF, CATCH BASIN T-17 (CONVERT C.B. TYPE 5) 13.000 EA, CATCH BASIN T-18 (CONVERT C.B. TYPE 7) 1.000 EA, CONCRETE CURB AND GUTTER(1'-6") VERTICAL FACE 1,050.000 LF, CONCRETE CURB AND GUTTER (2'-6") VERTICAL FACE 1,350.000 LF, CONCRETE SIDEWALK(4" UNIFORM) 1,425.000 SY, CONCRETE SIDEWALK(6" UNIFORM) 1,520.000 SY, DETECTABLE WARNING MATERIAL 587.500 SF, CONCRETE DRIVEWAY(6" UNIFORM) 1,250.000 SY, PEDESTRIAN RAMP CONSTRUCTION 1,175.000 SY, PERMANENT GRASSING FOR NON-PERMITTED RESURFACING PROJECTS 7.520 ACRE
- Call No
- 080
- File No
- 2177730
- Dbe Goal
- 0.00%
- Funding
- ST
- Counties
- Florence
- Project No
- P045479
- Letting Date
- 11/10/2026
- Letting Time
- 2:00 pm
- Notice Title
- 11102026 Proposal 5177470 - NTC 60 DAY AD
- Approx Length
- 11.8900
- Available Date
- Nov 6, 2026
- Categorized By
- llm
- Detail Fetched
- Yes
- Completion Date
- 9/30/2027