2027 COLLETON PAVEMENT IMPROVEMENT
Counties: Colleton
SC File No.: 1578380
Project No.: P045469
Completion Date: 11/30/2028
Funding: ST
DBE Goal: 0.00%
Approx. Length: 16.6500 miles
Letting: November 10, 2026 at 2:00 pm
The work includes mobilization, bonds and insurance, construction stakes, removal and disposal of existing pavement and curb, unclassified excavation, borrow excavation, additional rock for full depth reclamation, maintenance stone, cement modified recycled base (10" and 12" uniform) with curing method B, portland cement for cement modified recycled base course, liquid asphalt binder PG64-22, full depth asphalt pavement patching (6" and 8" uniform), milling existing asphalt pavement (1.5", 1.75", and variable), asphalt surface courses (types B, C, and E), driveway paving, asphalt surface treat (single treatment), traffic control, permanent construction signs (ground mounted), various pavement markings (white and yellow lines, arrows, word messages) in fast dry paint and permanent pavement marking, permanent clear and yellow pavement markers, milled-in rumble strips, furnish and install PVC conduit and copper wire, sawcut for loop detector, electrical enclosures, concrete curb and gutter, concrete sidewalk, detectable warning material, concrete driveway, pedestrian ramp construction, surface applied detectable warning, permanent grassing, and silt fence.
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261110-050), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.