US 17 AT BUCK HALL LANDING ROAD (RIGHT TURN LANE)
Counties: Charleston
SC File No.: 1075380
Project No.: P044592
Completion Date: 8/31/2027
Funding: FED
DBE Goal: 0.00%
Approx. Length: 0.1890 miles
Letting: October 13, 2026 at 2:00 pm
The work includes mobilization, bonds and insurance, construction stakes, clearing and grubbing, unclassified excavation (769 CY), borrow excavation (216 CY), fine grading (1,753 SY), maintenance stone (25 tons), liquid asphalt binder PG64-22 (37 tons), milling existing asphalt pavement 2.0" (100 SY), asphalt base course Type A (283 tons), asphalt intermediate course Type B (154 tons), asphalt surface course Type B (294 tons), traffic control, permanent construction signs (328 SF), various pavement markings (paint and thermoplastic), 18" RC pipe culvert Class III (92 LF), beveled end sections, rip-rap Class A (5 tons), geotextile for erosion control (9 SY), permanent grassing (0.7 acre), temporary cover (0.35 acre), sediment tubes (36 LF), silt fence (200 LF), and a stabilized construction entrance (25 SY).
We post new asphalt opportunities in South Carolina as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Read from this solicitation’s own documents — each row shows the exact quote it was matched to. Confirm final amounts and forms with the issuing agency before you submit.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: South Carolina Department of Transportation (solicitation 20261013-020), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.