The purpose of this project is to complete priority structure preventative maintenance repairs on structures along SR 11 through Scranton, PA. The SR 11 structures included in the project are SR 11 over N Main Ave, N Main Ave Retaining wall, SR 11 over Court St, SR 11 over Theodore St, SR 11 Leach Creek Culvert, and SR 11 over Keyser Ave. Other work includes milling and full depth paving of bridge approaches, resetting guiderail, sidewalk and drainage improvements, E&S control measures, temporary traffic control and signal modifications, pavement markings, bridge ppc overlays, beam and bearing repairs, abutment repairs, and other miscellaneous construction work. Construction will be completed using staged construction and detouring of traffic, as indicated on the approved drawings included in the bid package for STATE ROUTE 0011, SECTION P01, in LACKAWANNA COUNTY CITY OF SCRANTON from approximately 0.89 miles north of SR 307 at segment 0214 offset 0237 to approximately 0.50 miles south of SR 0006 at segment 0272 offset 2179. Also Included is STATE ROUTE 3013 from segment 0130 offset 1294 to segment 0140 offset 0357 and STATE ROUTE 3011/6307 from segment 0170 offset 1368 to segment 0240/0241 offset 1032/1038.
Additional Information: This is an ECMS project. All Addenda will be electronically posted. The location of the public bid opening is the Commonwealth Keystone Building, 7th Floor, Contract Awards Room, 400 North Street, Harrisburg. Allow sufficient time before the bid opening to contact Contract Awards and be escorted to the 7th Floor Contract Awards Room. Contract Awards can be reached at 717-395-9754. Due to recent changes in the Keystone Building, there is no longer a reception on the 5th Floor to greet and check-in visitors.
The work includes milling and full depth paving of bridge approaches, resetting guiderail, sidewalk and drainage improvements, E&S control measures, temporary traffic control and signal modifications, pavement markings, bridge ppc overlays, beam and bearing repairs, abutment repairs, and other miscellaneous construction. Construction will be completed using staged construction and detouring of traffic, as indicated on the approved drawings. The project covers SR 11 over N Main Ave, N Main Ave Retaining wall, SR 11 over Court St, SR 11 over Theodore St, SR 11 Leach Creek Culvert, and SR 11 over Keyser Ave, along with specified state routes and segments.
We post new general contractors opportunities in Pennsylvania as agencies publish them. Get them in one email — free, and unsubscribe whenever.
Most Pennsylvania work asks for the two below, and the solicitation documents are where it’s stated. One prequalification covers both — on this bid and the next.
A surety’s written statement that it expects to bond you up to a stated amount, subject to final underwriting. It’s what a GC or agency asks to see before they take your bid seriously.
Source: Pennsylvania Department of Transportation (PennDOT) (solicitation PENNDOT_117890_1), retrieved via a public procurement portal. View the official posting, and always confirm requirements and deadlines with the issuing agency.