EWEB requires approximately 150' of 16" ductile iron pipe and 100' of jacked and bored 24" steel casing to be installed at the Van Buren Street railroad crossing.
Pre-Bid Conference: N/A
Installation of approximately 150 feet of 16-inch ductile iron pipe and 100 feet of jacked and bored 24-inch steel casing at the Van Buren Street railroad crossing, including all associated trenching, backfill, boring and jacking, water distribution valves, testing, trench restoration, and coordination as specified in the project manual.